                     Street & Sidewalk Capital Projects


           Project Name                                        Project Description
         Preventive Street      This is the annual program where funds are dedicated to enhance the city's efforts for preventive
         Maintenance (2022-23) -   maintenance of city streets. The scope of this project provides asphalt and concrete crack sealing for
         New Project            approximately 20-40 streets, slurry sealing for 15-25 streets, asphalt microsurfacing for 5-10 streets,
                                concrete street partial pavement replacement for 10-20 streets and a two inch asphalt overlay for 10-15
                                streets.





         Preventive Street      This project will supplement funds for the annual program dedicated to enhance the city's efforts for
         Maintenance (Multi-Year) -   preventive maintenance of city streets. The scope of this project will provide for a range of preventive
         New Project            techniques such as crack sealing, slurry seal, asphalt overlay, and concrete partial replacement for
                                qualified city streets.







         Preventive Street      This is for additional funds for the annual program where funds are dedicated to enhance the city's
         Maintenance (Multi-Year) -   efforts for preventive maintenance of city streets. The scope of this project will provide for additional
         Continuing Project     crack sealing, slurry seal and a 2 inch asphalt overlay for identified City streets.








         Rufe Snow Dr. Street &   This project widens approximately 5,300 feet of the existing 5-lane thoroughfare to 7-lanes.  This
         Utility Imp. (Mid-Cities to   section of Rufe Snow Drive will be reconstructed as a concrete street with sidewalks along both sides,
         Hightower)[TEA-21] -   signalization improvements at the major intersections and all necessary water and sewer main
         Continuing Project     adjustments.  The funding for design will be provided by the 1994 Bond Program and Federal Grants
                                (TEA-21).  The funding for the construction phase of this project will come from the 2003 Bond
                                Program and Federal Grants.




         Sao Paulo Court        This is the 48th Year Community Development Block Grant (CDBG) Project.  The project will consist of
         Reconstruction - New   reconstructing the entire length (410 linear feet) of Sao Paulo Court. The estimated cost for this project
         Project                is $369,416.  The City's portion is $15,000.








         Sidewalk Rehabilitation and   This project provides for rehabilitation of the city's sidewalk system. Funding will allow for the
         Replacement Project (2021-  replacement of approximately 7,000 square feet of deteriorated sidewalks in residential and high
         22) - Continuing Project  pedestrian areas.