Street & Sidewalk Capital Projects
Project Name Project Description
Preventive Street This is the annual program where funds are dedicated to enhance the city's efforts for preventive
Maintenance (2022-23) - maintenance of city streets. The scope of this project provides asphalt and concrete crack sealing for
New Project approximately 20-40 streets, slurry sealing for 15-25 streets, asphalt microsurfacing for 5-10 streets,
concrete street partial pavement replacement for 10-20 streets and a two inch asphalt overlay for 10-15
streets.
Preventive Street This project will supplement funds for the annual program dedicated to enhance the city's efforts for
Maintenance (Multi-Year) - preventive maintenance of city streets. The scope of this project will provide for a range of preventive
New Project techniques such as crack sealing, slurry seal, asphalt overlay, and concrete partial replacement for
qualified city streets.
Preventive Street This is for additional funds for the annual program where funds are dedicated to enhance the city's
Maintenance (Multi-Year) - efforts for preventive maintenance of city streets. The scope of this project will provide for additional
Continuing Project crack sealing, slurry seal and a 2 inch asphalt overlay for identified City streets.
Rufe Snow Dr. Street & This project widens approximately 5,300 feet of the existing 5-lane thoroughfare to 7-lanes. This
Utility Imp. (Mid-Cities to section of Rufe Snow Drive will be reconstructed as a concrete street with sidewalks along both sides,
Hightower)[TEA-21] - signalization improvements at the major intersections and all necessary water and sewer main
Continuing Project adjustments. The funding for design will be provided by the 1994 Bond Program and Federal Grants
(TEA-21). The funding for the construction phase of this project will come from the 2003 Bond
Program and Federal Grants.
Sao Paulo Court This is the 48th Year Community Development Block Grant (CDBG) Project. The project will consist of
Reconstruction - New reconstructing the entire length (410 linear feet) of Sao Paulo Court. The estimated cost for this project
Project is $369,416. The City's portion is $15,000.
Sidewalk Rehabilitation and This project provides for rehabilitation of the city's sidewalk system. Funding will allow for the
Replacement Project (2021- replacement of approximately 7,000 square feet of deteriorated sidewalks in residential and high
22) - Continuing Project pedestrian areas.