                     Street & Sidewalk Capital Projects


           Project Name                                        Project Description
         Acts Court Retaining Wall -   This project will reconstruct approximately 150 linear feet of retaining wall on the north side of Starnes
         New Project            Road, immediately west of Acts Court.  The existing 5'-7' tall terraced RR tie retaining wall will be
                                replaced with a concrete or masonry wall.







         Bedford Euless Road    The project consists of engineering and construction of approximately 2,800 linear feet of Bedford
         Reconstruction - Continuing   Euless Road from Booth Calloway Road to just east of Strummer Drive.  The improvements include
         Project                reconstructing the existing roadway with reinforced concrete, including the addition of pedestrian
                                facilities.  The road will be reconstructed within the existing right-of-way based on the Transportation
                                Plan recommendation that the section be reduced to a three-lane configuration; this is not a roadway
                                expansion.




         Crystal Lane - Continuing   The project consists of the design and reconstruction of approximately 830 linear feet of Crystal Lane
         Project                from Northeast Parkway to Kara Place.  The improvements include reconstructing the existing roadway
                                with new full-depth subgrade, limited curb and gutter replacement, and new asphalt pavement.  The
                                road will be reconstructed within the existing right-of-way in its current configuration; this is not a
                                roadway expansion.





         Daniel Drive - Continuing   The project consists of the design and reconstruction of approximately 830 linear feet of Daniel Drive
         Project                from Briardale Drive to Smithfield Road.  The improvements include reconstructing the existing
                                roadway with new full-depth subgrade, limited curb and gutter replacement, and new asphalt
                                pavement.  The road will be reconstructed within the existing right-of-way in its current configuration;
                                this is not a roadway expansion.






         Dawn Drive - Continuing   The project consists of the design and reconstruction of approximately 2,100 linear feet of Dawn Drive
         Project                from Onyx Drive North to Glenview Drive.  The improvements include reconstructing the existing
                                roadway with new full-depth subgrade, limited curb and gutter replacement, and new asphalt
                                pavement.  The road will be reconstructed within the existing right-of-way in its current configuration;
                                this is not a roadway expansion.





         Diamond Loch West Courts   The project consists of the design and reconstruction of approximately 200 linear feet of two Diamond
         Reconstruction - Continuing   Loch West courts from located off of the main Diamond Loch West roadway.  The improvements
         Project                include reconstructing the existing roadway with new full-depth subgrade, limited curb and gutter
                                replacement, and new asphalt pavement.  The road will be reconstructed within the existing right-of-
                                way in its current configuration; this is not a roadway expansion.