Street & Sidewalk Capital Projects
Project Name Project Description
Meadow Oak Drive The project consists of the design and reconstruction of approximately 900 linear feet of Meadow Oaks
Reconstruction - Continuing Drive from Dick Lewis to Buenos Aires. The improvements include reconstructing the existing roadway
Project with new full-depth subgrade, limited curb and gutter replacement, and new asphalt pavement. The
road will be reconstructed within the existing right-of-way in its current configuration; this is not a
roadway expansion.
Nob Hill Drive The project consists of the design and reconstruction of approximately 1,365 linear feet of Nob Hill
Reconstruction - Continuing Drive from just west of High Oaks Drive to the dead end. The improvements include reconstructing the
Project existing roadway with new full-depth subgrade, limited curb and gutter replacement, and new asphalt
pavement. The road will be reconstructed within the existing right-of-way in its current configuration;
this is not a roadway expansion.
Nor'East Drive The project consists of the design and reconstruction of approximately 2,500 linear feet of Nor'East
Reconstruction - Continuing Drive from the dead end to Davis Boulevard. The improvements include reconstructing the existing
Project roadway with new full-depth subgrade, limited curb and gutter replacement, and asphalt pavement.
The road will be reconstructed within the existing right-of-way in its current configuration; this is not a
roadway expansion.
North Hills Drive The project consists of the design and reconstruction of approximately 3,600 linear feet of North Hills
Reconstruction - Continuing Drive from the City Limit to Wendell Drive. The improvements include reconstructing the existing
Project roadway with new full-depth subgrade, limited curb and gutter replacement, and new asphalt
pavement. The road will be reconstructed within the existing right-of-way in its current configuration;
this is not a roadway expansion.
Northeast Parkway / Davis This project consists of engineering and construction of a new traffic signal at the intersection of Davis
Blvd. Traffic Signal - Boulevard and Northeast Parkway. The scope includes paving and signal improvements.
Continuing Project
Northeast Parkway This project consists of constructing an extension of Northeast Parkway west of Davis Boulevard
Extension - Continuing towards Smithfield Road. The new pavement will intersect with Davis at a proposed traffic signal, and
Project will include a roundabout midway between Davis and Smithfield to accommodate a future Snider Street
connection and provide traffic calming. The project will be constructed in two phases, with the Davis
connection through the roundabout included in Phase I, and the connection to Smithfield in Phase II
after the existing elementary school is demolished in 2021.