ADOPTED | BUDGET


                     Street & Sidewalk Capital Projects


           Project Name                                        Project Description
         Meadow Oak Drive       The project consists of the design and reconstruction of approximately 900 linear feet of Meadow Oaks
         Reconstruction - Continuing   Drive from Dick Lewis to Buenos Aires.  The improvements include reconstructing the existing roadway
         Project                with new full-depth subgrade, limited curb and gutter replacement, and new asphalt pavement.  The
                                road will be reconstructed within the existing right-of-way in its current configuration; this is not a
                                roadway expansion.





         Nob Hill Drive         The project consists of the design and reconstruction of approximately 1,365 linear feet of Nob Hill
         Reconstruction - Continuing   Drive from just west of High Oaks Drive to the dead end.  The improvements include reconstructing the
         Project                existing roadway with new full-depth subgrade, limited curb and gutter replacement, and new asphalt
                                pavement.  The road will be reconstructed within the existing right-of-way in its current configuration;
                                this is not a roadway expansion.





         Nor'East Drive         The project consists of the design and reconstruction of approximately 2,500 linear feet of Nor'East
         Reconstruction - Continuing   Drive from the dead end to Davis Boulevard.  The improvements include reconstructing the existing
         Project                roadway with new full-depth subgrade, limited curb and gutter replacement, and asphalt pavement.
                                The road will be reconstructed within the existing right-of-way in its current configuration; this is not a
                                roadway expansion.





         North Hills Drive      The project consists of the design and reconstruction of approximately 3,600 linear feet of North Hills
         Reconstruction - Continuing   Drive from the City Limit to Wendell Drive.  The improvements include reconstructing the existing
         Project                roadway with new full-depth subgrade, limited curb and gutter replacement, and new asphalt
                                pavement.  The road will be reconstructed within the existing right-of-way in its current configuration;
                                this is not a roadway expansion.






         Northeast Parkway / Davis   This project consists of engineering and construction of a new traffic signal at the intersection of Davis
         Blvd. Traffic Signal -   Boulevard and Northeast Parkway.  The scope includes paving and signal improvements.
         Continuing Project








         Northeast Parkway      This project consists of constructing an extension of Northeast Parkway west of Davis Boulevard
         Extension - Continuing   towards Smithfield Road.  The new pavement will intersect with Davis at a proposed traffic signal, and
         Project                will include a roundabout midway between Davis and Smithfield to accommodate a future Snider Street
                                connection and provide traffic calming.  The project will be constructed in two phases, with the Davis
                                connection through the roundabout included in Phase I, and the connection to Smithfield in Phase II
                                after the existing elementary school is demolished in 2021.