ADOPTED | BUDGET


                     Street & Sidewalk Capital Projects


           Project Name                                        Project Description
         Sidewalk Rehabilitation and   This project provides for rehabilitation of the city's sidewalk system. Funding will allow for the
         Replacement Project (2022-  replacement of approximately 7,000 square feet of deteriorated sidewalks or new sidewalk in
         23) - New Project      residential and high pedestrian areas.







         Sierra Drive - Continuing   The project consists of the design and reconstruction of approximately 1,100 linear feet of Sierra Drive
         Project                from Cancun Drive to Caracas Drive.  The improvements include reconstructing the existing roadway
                                with new full-depth subgrade, limited curb and gutter replacement, and new asphalt pavement.  The
                                road will be reconstructed within the existing right-of-way in its current configuration; this is not a
                                roadway expansion.





         South Crest Drive -    The project consists of the design and reconstruction of approximately 630 linear feet of South Crest
         Continuing Project     Drive from Crane Road to Rolling Hills Drive.  The improvements include reconstructing the existing
                                roadway with new full-depth subgrade, limited curb and gutter replacement, and new asphalt
                                pavement.  The road will be reconstructed within the existing right-of-way in its current configuration;
                                this is not a roadway expansion.





         Southampton Drive      The project consists of the design and reconstruction of approximately 1,700 linear feet of
         Reconstruction - Continuing   Southampton Drive from Wakefield Road to Chapman Road.  The improvements include
         Project                reconstructing the existing roadway with new full-depth subgrade, limited curb and gutter replacement,
                                and new asphalt pavement.  The road will be reconstructed within the existing right-of-way in its current
                                configuration; this is not a roadway expansion.






         Stonybrooke Drive      The project consists of the design and reconstruction of approximately 1,240 linear feet of Stonybrooke
         Reconstruction - Continuing   Drive from Stephanie Drive to approximately 340' north of Hightower. The improvements include
         Project                reconstructing the existing roadway with new full-depth subgrade, limited curb and gutter replacement,
                                and new asphalt pavement.  The road will be reconstructed within the existing right-of-way in its current
                                configuration; this is not a roadway expansion.





         Street Assessment Project -   The City of North Richland Hills roadway network is comprised of 549 lane miles and this project is for
         New Project            a consultant to utilize specialized automated equipment such as ground penetrating radar to collect
                                data, analyze, and process the data in an overall pavement assessment.   The assessment will yield a
                                digital condition rating system, budget stressing software that allows modification of the techniques that
                                would result in a prediction of the future condition rating, and create five and/or ten year programs that
                                would indicate where funds could be used most impactfully.