Street & Sidewalk Capital Projects
Project Name Project Description
Glenview Drive East The project consists of engineering and construction of approximately 2,700 linear feet of Glenview
Project - Continuing Project Drive from Boulevard 26 to Flory Street. The improvements include reconstructing the existing
roadway with reinforced concrete, including the addition of sidewalks. The road will be rebuilt to its
current width; this is not a roadway expansion.
Glenview Drive West The project consists of engineering and construction of approximately 3,100 linear feet of Glenview
Project - Continuing Project Drive from Honey Lane to the city limit line just east of Big Fossil Creek. The improvements include
reconstructing the existing roadway with reinforced concrete, including the addition of sidewalks. The
road will be rebuilt to its current width; this is not a roadway expansion.
Project Status: Final design underway. Bidding anticipated summer 2022.
Grand Avenue (Library to This project consists of extending the paving improvements on Grand Avenue next to the new library
Health Markets Access where the Public Works Department has temporarily placed asphalt. Specifically, the limits of this
Road) - Continuing Project project are from the end of the current concrete section of Grand Avenue to the Health Markets Access
Road. Portions of this project were included as additive alternates in the "Grand Avenue Street and
Utility Improvements" project (ST0702); however, the project funding was unable to support additional
improvements beyond the base project. The current asphalt section will be replaced with a 26 foot
wide concrete pavement section. This section will only consist of 2 lanes for traffic. The on-street
parking will be installed by the developer.
Harmonson Road - The project consists of the design and reconstruction of approximately 2,100 linear feet of Harmonson
Continuing Project Road from Dawn Drive to the Mackey Creek channel. The improvements include reconstructing the
existing roadway with new full-depth subgrade, and new pavement. Sidewalks will be reconstructed as
needed, with any missing segments filled in. The road will be reconstructed within the existing right-of-
way in its current configuration; this is not a roadway expansion.
Hightower / Davis Traffic The project consists of engineering and construction of a new traffic signal at the intersection of Davis
Signal - Continuing Project Boulevard and Hightower Drive. The scope includes coordination with TxDOT, paving and signal
improvements.
Iron Horse Boulevard East The project consists of the design and reconstruction of approximately 4,400 linear feet of Iron Horse
Reconstruction - Continuing Boulevard from Rufe Snow Drive to York Street. The improvements include reconstructing the existing
Project roadway with reinforced concrete, including the addition of pedestrian facilities. The road will be
reconstructed within the existing 80' right-of-way based on the Transportation Plan recommendation
that the section be reduced to a divided two-lane configuration; this is not a roadway expansion.