Page 455 - Southlake FY22 Budget
P. 455

CAPITAL IMPROVEMENTS  PROGRAM (CIP)

                                     STOrM WATEr



                                City of Southlake FY 2022 CIP Project Status Form

                  North White Chapel Bridge Replacement at Kirkwood Branch  South Kirkwood Branch
                                                                                      BOB JONES
           DEPARTMENT: Public Works                                          BOB JONES
           PROJECT
           LOCATION:   N White Chapel Bridge across Kirkwood Branch

           PROJECT TIMELINE: Oct 2021  to  Sept 2026
                                                                                         Project Location
           DESCRIPTION:
           Funding is planned for the design and construction of a new bridge along North White
           Chapel Boulevard over Kirkwood Creek Branch. The flood and feasibility studies for
           the permanent solution to span these branches are currently underway. This section of
           roadway flooded in May 2015 due to heavy rainfall and overflow from Lake Grapevine  N WHITE CHAPEL
           and was closed for approximately 7 weeks. The road was overtopped most recently in
           September 2018 and underwent 6 months of repair before reopening. The roadway
           was closed in March 2020 due to flooding as well.
           The proposed funding plan assumes full City of Southlake funding for the project;
           however, the City is currently exploring funding partnership options that if successful,
           would lower the City's portion of funding. If those partnerships are successful, future  DOVE
           funding plans will reflect only the City's portion of the cost, showing a reduction from
           the current plan.                                        New Request     Continuation Project  Partnership  DOVE
           JUSTIFICATION:                                           Mandated /    Replacement / Major   Community
                                                                                      TEXAS
                                                                                      114
           The road is inundated during heavy rain events which limits mobility access north of  Public Health /   Rehab or Protection   Need / Service  CARROLL  L  L  A
                                                                    Safety
                                                                                  of Capital Stock
                                                                                                   Enhancement
           the crossing. In an event of emergency this will increase response time for PD and FD                             B
           due to the need of using an alternative route.           2030/2035 COMPREHENSIVE PLAN? If yes, include ref:       M  I
                                                                           PEYTONVILLE                                       K
                                                                    Sustainability Master Plan - Objective 10.6
                                                                                              HIGHLAND
           ALTERNATIVES / IMPACTS IF PROJECT IS NOT FUNDED:          COMPANION PROJECT? If yes, please explain:      HIGHLAND
           Limited access if road is inundated. Previous emergency repair performed is not a long  Utility Fund, SWUS         KIRKW O OD
                                                                                   SHADY OAKS
           term solution.                                                                   N WHITE CHAPEL
           STRATEGIC FOCUS AREA: Infrastructure, Safety FLORENCE RD  RANDOL MILL  REVENUE GENERATING? If yes, please explain:   CARROLL
           PROJECT #:  2022-50c                                                                                     TEXAS
                                                    EXPENDITURE SCHEDULE                                            114
             CAPITAL PROJECT COSTS  TOTAL PRIOR  2022  2023    2024     2025     2026    UNFUNDED     TOTAL
              PLANNING / FEASIBILITY STUDY  PEARSON LN  FM 4091           SOUTHLAKE               FM 1709  0      SOUTHLAKE
             ENGINEERING & DESIGN; TESTING  555,000  500,000  340,000                               1,395,000
                 LAND & ROW ACQUISITION                                                                0                                N OLEN
                                                                                                     BYRON NELSON
           LANDSCAPING,  ART,  URBAN  DESIGN                                                           0                      L  L
                      CONSTRUCTION  595,000  FM 1709                  5,860,000                     6,455,000  CARROLL         A  B  M
                       CONTINGENCY                                PEYTONVILLE  1,525,000            1,525,000                  I  K
                          TOTAL  1,150,000  500,000  340,000   0      7,385,000   0     N WHITE CHAPEL  0  9,375,000
                                                     OPERATIONAL IMPACT
           OPERATIONAL PROJECT COSTS  TOTAL PRIOR  2022  2023  2024     2025     2026    UNFUNDED     TOTAL
                                                                       CONTINENTAL                    CONTINENTAL
                   MAINTENANCE COSTS                                            5,000      5,000     10,000
                    PERSONNEL COSTS                                                                    0
                          TOTAL    0         0        0        0         0      5,000      5,000     10,000                 26
                                                      FUNDING SCHEDULE                                             BRUMLOW
             CAPITAL FUNDING SOURCE  TOTAL PRIOR  2022  2023   2024     2025     2026    UNFUNDED     TOTAL
                      GENERAL FUND                                                                     0
                           CEDC                                                                        0
                           CCPD                                                                        0
               PARK DEDICATION FEE FUND                                                                0
                     PUBLIC ART FUND                                                                   0
               ROADWAY IMPACT FEE FUND                                                                 0
              SANITARY SEWER IMPACT FEE                                                                0
                           SPDC                                                                        0
           STORMWATER UTILITY SYSTEM FUND  2,675,000  1,375,000  1,500,000  3,075,000               8,625,000
                          TIRZ #1                                                                      0
                       UTILITY FUND          0      150,000  600,000                                 750,000
                 WATER IMPACT FEE FUND                                                                 0
                          TOTAL  2,675,000   0      1,525,000  2,100,000  3,075,000  0      0       9,375,000
           CCPD: CRIME CONTROL & PREVENTION DISTRICT                                SPDC: SOUTHLAKE PARKS DEVELOPMENT CORPORATION
             CEDC: COMMUNITY ENHANCEMENT & DEVELOPMENT CORPORATION                     TIRZ #1:  TAX INCREMENT REINVESTMENT ZONE #1