Page 447 - Southlake FY22 Budget
P. 447

CAPITAL IMPROVEMENTS  PROGRAM (CIP)

                                     STOrM WATEr



                       Funding   Total Prior
         Project number                      FY 2022   FY 2023   FY 2024  FY 2025   FY 2026   Beyond      Total
                        Source    Funding

        Sanitary Sewer   Funding is requested to mitigate erosion at critical wastewater infrastructure, such as manholes and sewer mains, at drainage/
        Infrastructure   creek crossings. Re-stabilization of the embankment is necessary in order to provide  proper protection/support of the
        Erosion       infrastructure and prevent a wastewater overflow. Such an event (wastewater overflow) would create a negative and unpleasant
        Protection    environmental impact to the stormwater system and aquatic life.



                      Storm
        2022-45       Water Utility      $0  $2,000,000      $0       $0        $0        $0        $0   $2,000,000
                      System



        Gateway Lakes   Funding is requested for the engineering and construction of drainage improvements in Gateway Lakes Park. One of the
        Park Drainage   ponds in the Gateway Lakes Park is in danger of breaching due to significant erosion near the embankment and immediately
        Improvements   downstream. The engineering tasks will include a drainage study to design a spillway for the pond, gabion channel armoring
        & Bridge      downstream and the replacement of two pedestrian bridges.
        Replacement


                      Storm
        2022-46c      Water Utility   $350,000  $450,000     $0       $0        $0        $0        $0     $800,000
                      System

                      Park
        2022-46c      Dedication         $0    $250,000      $0       $0        $0        $0        $0     $250,000
                      Fund
                      Total          $350,000  $700,000      $0       $0        $0        $0        $0   $1,050,000



                      Funding is requested to design and construct a drainage ditch, culvert and channel along Morgan Road. Due to the current slope
        Morgan Road   and design, Maintenance has been performed multiple times throughout the past years. Field and drainage investigation has
        Drainage      been performed to determine that the current system is best to be redesigned to prevent potential flooding damages to public
        Improvements
                      and private property.

                      Storm
        2022-47       Water Utility      $0    $50,000   $250,000     $0        $0        $0        $0     $300,000
                      System





                      Funding is requested for the implementation of recommendations from the storm water master plan focused on regional
        Drainage Basin   detention opportunities at strategic locations around the City.  The intent of this project is to allocate funds to purchase land or
        Enhancements  participate with developers to incorporate regional detention into future open space.



                      Storm
        2022-48       Water Utility   $300,000  $50,000  $50,000  $50,000   $50,000   $50,000   $50,000    $600,000
                      System













      446   FY 2022 City of Southlake  |  BUDGET BOOK
            WWW.CITYOFSOUTHLAKE.COM
   442   443   444   445   446   447   448   449   450   451   452