CAPITAL IMPROVEMENTS  PROGRAM (CIP)

                                     WATEr



                       Funding   Total Prior
         Project number                      FY 2022   FY 2023   FY 2024  FY 2025   FY 2026   Beyond      Total
                        Source    Funding



        System Capacity  Funding provides staff and Council with resources to reimburse developers for the oversizing of water lines to meet the
        Improvements   requirements of the Southlake 2030 Water Master Plan in cases where the developer is not required to provide the ultimate size
        (Water) - Future   of the line to serve proposed developments.
        Projects

                      Water
        2022-30                      $775,000  $105,000  $110,000  $115,000  $122,000  $128,000  $135,000  $1,490,000
                      Impact Fee


        12” Water Line
        along Union
        Church/ Pearson  Funding is planned for engineering design, right-of-way, and construction of a 12-inch water line along Union Church and
                      Pearson Lane from FM 1938 to FM 1709.
        from FM 1938 to
        FM 1709
                      Water
        2022-31                      $700,000      $0  $1,100,000     $0        $0        $0        $0   $1,800,000
                      Impact Fee


        12-inch Water
        line along Shady   Funding is planned for right-of-way, engineering design, and construction of a 12-inch water line along Shady Oaks Drive from
        Oaks Drive from   Fox Glen to West Dove Road. This project follows the 12-inch water line project paralleling Shady Oaks from Highland Street to
        Fox Glen to   Fox Glen (Phase I). Phase II is the continuation to the north from Fox Glen to West Dove Road.
        West Dove Road
        (Phase II)
        2022-32       Utility Fund       $0        $0    $400,000  $450,000  $650,000     $0        $0   $1,500,000



        12-inch Water
        line along Randol  Funding is planned for right of way, engineering design and construction to upsize an existing 8-inch water line to 12-inch along
        Mill Avenue from
        Morgan Road to   Randol Mill Avenue from Morgan Road to Dove Road.
        Dove Road
        2022-33       Utility Fund       $0        $0    $350,000 $1,500,000    $0        $0        $0   $1,850,000




        8-inch Water line  Funding is planned for right-of-way, engineering design and construction of an 8-inch water line to connect the dead-end water
        along Bob Jones  lines located at Brooks Court and East Bob Jones Road. This project will create a looped water system, improving water quality
        Road to Walnut  and fire protection within this region. This item was not part of Southlake 2030, but later identified in the Water Quality Study
        Brooks        produced by Freese and Nichols, Inc.


        2022-34       Utility Fund       $0        $0    $300,000  $600,000  $900,000     $0        $0   $1,800,000



        8-inch Water
        line from Walnut   Funding is planned for right-of-way, engineering design, and construction of an 8-inch water line to connect the dead-end water
                      lines located at Walnut Grove and the Bob Jones Dog Park. This project will create a looped water system, improving water
        Grove terminus   quality and fire protection within this region. This item was not part of Southlake 2030 but later identified in the Water Quality
        to E. Bob Jones   Study produced by Freese and Nichols, Inc.
        Dog Park
        2022-35       Utility Fund       $0        $0    $500,000  $700,000  $700,000     $0        $0   $1,900,000