ROOF REPLACEMENT AT FS 1
FC2102
352-(&7 '(6&5,37,21 -867,),&$7,21
This request is to replace the roof system and seal the building envelope at Fire Station #1 ($120,000).
This roof is at the useful life expectancy. It was identified in the Envelope Study performed in 2011. The roof and building
envelope at Fire Station #1is original to construction and should be replaced.
Note: Project funding source is Facility Services Fund (505).
352-(&7 67$786 25,*,1$/ 25,*,1$/
67$57 '$7( 5(9,6,21 (1' '$7( 5(9,6,21
Professional Services
Engineering
Land/ROW Acquisition
Construction 10/2020 09/2021
Other
5(9,6,21 (;3/$1$7,21
We are hiring a roofing consultant to assist with the specification development for the roofing system. We will be changing the
roofing system from the current built up system to a TPO system consistent with the roof systems at City Hall, NRH Centre,
and the AARC. We will also be bring the roofing system up to code with raising the HVAC curbs.
),1$1&,$/ '$7$
$'237(' 5(9,6(' 727$/
%8'*(7 7+58 352-(&7 %8'*(7 7+58 5(0$,1,1* 352-(&7
5(9,6,21 %$/$1&( &267
)81',1* 6285&(6
Facilities Reserves $120,000 $12,000 $132,000 $132,000
0 $0
0 $0
0 $0
0 $0
7RWDO $120,000 $12,000 $132,000 $0 $132,000
352-(&7 (;3(1',785(6
$0 $0
Professional Services
Engineering/Design 0 $0
Land/ROW Acquistion 0 $0
Construction 120,000 12,000 132,000 $132,000
Other 0 $0
7RWDO $120,000 $12,000 $132,000 $0 $132,000
,03$&7 21 23(5$7,1* %8'*(7
We will provide a better roofing system which should reduce operating cost to heat and cool the facility.
$118$/ 23(5$7,1* ,03$&7 727$/
Projected $0
296