                                      Goal 1: Plan, Manage, and Maintain Public Assets
                                    Objective 2: Maintain City Standards for all Municipal Buildings
                          Project                   Performance Measure(s)         City Service Team (Department)
             Core  Airwall Track Repair (Exhibit     Cost Recovery            Economic Development and Capital
             INF   Hall)                         Event Satisfaction Rating    Investment (Convention Center)
             1.2.3
             Summary:

             The Airwall in the Exhibit Hall is original to the building and   Milestone   Estimated    Status
             surpasses the recommended lifespan of 12‐15 years. It is                      Start Date
             imperative that this repair be made because it is essential to the   Develop Scope of Work   3/1/2019
             functionality of the building. The Airwall allows the Exhibit Hall   Bid Project   4/1/2019
             to be used to its maximum effectiveness by allowing the space   Project Walk‐Thru   4/15/2019
             to be divided into 4 spaces. Neglecting the repair of the air wall
                                                                     Installation Begins   8/1/2019
             will limit the usage of the Exhibit Hall, ultimately creating the   Project Completed   9/30/2019
             potential for lost revenue.  This repair will be the most cost‐
             effective way to make the walls fully functional.  A complete
             replacement of the Airwalls would cost an estimated 1.1 million.

             The wall panels were refurbished in FY 2017 and this Business
             Issue will complete the repair and the refurbishment of the
             mechanical system.  One section of the Airwall track was already
             replaced in FY 2017 as an emergency expenditure.

             Update:
                   th
             In the 4  quarter, all funding for this project was used for
             emergency repairs in other areas of the building.