Page 302 - CityofWataugaAdoptedBudgetFY25
P. 302

CIP AND CAPITAL PROJECTS FUNDS


                            ADVANCED METERING INFRASTRUCTURE (AMI) PROJECT

               ❖  Description: This project is for the
                   replacement  of  the  City’s  current
                   outdated  water  metering  system
                   with a modern, adaptable advanced
                   metering     Infrastructure     (AMI)
                   solution.

                   Justification:    The  City’s  current
                   water metering system is outdated.
                   The AMI solution allows for remote
                   meter reading, which eliminates the
                   need to read directly from the meter
                   box.  Utility billing will be able to collect meter readings more efficiently, accurately, and
                   faster.  Because the data transmits from the endpoint directly to the software, there are
                   less opportunity of error and the need for re-read situations.

                   Operating Impact: This project is being funded with the 2024 Certificate of Obligation
                   issuance.


















































                                                             282
   297   298   299   300   301   302   303   304   305   306   307