                          FY2024-2025 LEAD WATER SERVICE LINE IDENTIFICATION PROGRAM


               ❖  Description:  The  EPA  published  a  new  rule
                   where  the  City  is  required  to  develop  and
                   maintain a lead water service line inventory.
                   The purpose of this project is to locate every
                   water  meter  in  the  City  and  determine  the
                   service  line  material.    While  we  did  this,  we
                   located all water valves and fire hydrants.  We
                   estimated  8,341  water  meters,  1,703  water
                   valves and 653 fire hydrants in the City.  The
                   identification  inventory  was  completed  in
                   October  2024  with  8,471  total  service  lines
                   inspected with 6 identified as containing lead,
                   11 identified as galvanized lines still requiring
                   replacement, and 8,454 identified as non-lead.
                   All information will be placed into the Watauga
                   GIS maps for record purposes.  The identified
                   lead  water  service  lines  will  need  to  be
                   replaced.    We  anticipate  performing  these
                   replacements within a CIP project.  This project
                   includes     small,    previously     unidentified
                   wastewater and water line problems detected
                   and repaired throughout the fiscal year.

                   Justification:  Lead  service  lines  have  been
                   identified as the primary contributor of lead in
                   drinking water.  This project will identify any lead pipe inventory in the system and address
                   a plan for replacement of those pipes.

                   Operating Impact: This project is funded through the ARPA grant.




                                 OTHER UTILITY SYSTEM PROJECTS




                                 FY2024-2025 UTILITY MAINTENANCE PROJECTS

               ❖  Description: This project includes small, previously unidentified wastewater and water
                   line problems detected and repaired throughout the fiscal year.








                                                             280
   295   296   297   298   299   300   301   302   303   304   305