Page 98 - ArlingtonFY24AdoptedBudget
P. 98
Business Plan
Infrastructure
Goal 1: Plan, Manage, and Maintain Public Assets
Objective 1: Maintain City Standards for all Equipment
Project Performance Measure(s) Department(s)
Core Airport Lighting Control Panel Total Aircraft Operations Transportation
INF Upgrade
1.1.2
Summary:
Numerous airport visual aides are available to provide information and guidance to pilots maneuvering around airports.
The main component for navigation on the airport is the airfield lighting and control circuit. The current airport lighting
control panels were installed in 2012 and are no longer supported by the manufacturer with parts or tech support. A new
airport lighting control panel system is necessary to provide pilots with reliable navigational assistance needed during low-
visibility and night operations.
Airport Lighting Control Panel Upgrade
Receive proposal from vendor
Purchase replacement
equipment
Vendor replacement of
equipment
Final inspection
10/23 12/23 02/24 05/24
FY 2024 Adopted Budget and Business Plan 89 City of Arlington, Texas