Business Plan




                                                    Infrastructure


                          Goal 2: Support and Expand Programs to Reduce Environmental Impacts
                                   Objective 1: Mitigate Operating Costs and Impact on Environment
                         Project                     Performance Measure(s)                Department(s)
             Core   Advanced Metering         Install 10,000 meters and MIUs in FY 2024   Water Utilities
             INF   Infrastructure
             2.1.1
             Summary:
                                                                                         Estimated     Actual
             The City of Arlington Water Utilities will install 10,000   Milestone      Completion   Completion
             meters and MIU’s in 2024 through an ongoing meter   Begin MUI/Meter Installs   Oct. 2023
             replacement program and water line renewals.       2023-24
                                                                Council Approval of Meter  Feb. 2024
             The MIU receives input from the meter register and   Replacement funding
             remotely sends data to a fixed base data collector, located   Council Approval of   Mar. 2024
             at one of five elevated storage tanks around the City. Top   Annual Meter Supply
             of the hour readings and other diagnostics are instantly   Contract
             forwarded to the network allowing for a greater    Complete MIU/Meter      Sept. 2024
             awareness of the distribution system and possible on   Installation for FY 2024
             property leak conditions.  In addition, the MIU stores up to
             35 days of hourly consumption, providing the utility with
             the ability to extract detailed usage profiles for consumer
             education, such as water conservation, and billing dispute
             resolution.

                                                    Infrastructure


                          Goal 2: Support and Expand Programs to Reduce Environmental Impacts
                                   Objective 1: Mitigate Operating Costs and Impact on Environment
                         Project                   Performance Measure(s)                Department(s)
             Core  Water Conservation Program   Maintain metered ratio rolling   Water Utilities
             INF                             average above 88%
             2.1.2
             Summary:

             The City of Arlington Water Utilities will maintain a              Metered Ratio
             metered ratio rolling average above 88%.  In FY 2024,   100%
             Arlington Water Utilities will proactively evaluate 25,000   90%
             linear feet of water line for leaks to catch them in the   80%
             early stages before significant water loss occurs.    70%
             Arlington Water Utilities will also evaluate and make   60%
             recommendations to purchase additional leak detection   50%
             technologies to accomplish this goal.              40%
                                                                30%
                                                                20%
                                                                10%
                                                                 0%
                                                                      FY 2024 1st Qtr  2nd Qtr 3rd Qtr  4th Qtr
                                                                       Total