Page 404 - Southlake FY20 Budget
P. 404

Storm Water Utility System Fund
                                                                                                                    CIP

                                                                                     STORM WATER UTIlITY SYSTEM FUnD



               SPIN   Neigh-  bor-  hood  1                 5             All                3                4

                Comprehen-  sive Plan   Reference  Storm Water   Master Plan -   #6 - Tier 2  Sustainability   Master Plan  Storm Water   Master   Plan#1 Tier 2  Sustainability   Master Plan



              Project's   Impact to   Annual   Operating   Budget  $15,000  $1,500           $10,000          $0



              Descrip-  tion of   Annual   Impact on   Operating   Budget  Anticipate   preven-  tive and   recurring   mainte-  nance   costs.  Increase in   preven-  tive and   corrective   mainte-  nance.  Increase in   preven-  tive and   corrective   mainte-  nance.  Culvert   clean-  ing and   channel   regrading.  Anticipat-  ed repair   should   preclude   continual   mainte-  nance.


                FY 2020   Cumula-  tive  $900,000           $1,400,000    $1,500,000         $1,800,000       $1,800,000




                 Total                $10,675,000           $1,550,000    $100,000           $800,000         $850,000


                Beyond /   Unfunded   $6,500,000            $0            $0                 $100,000         $0



                 FY 2024              $500,000              $0            $0                 $100,000         $0


                 FY 2023              $500,000              $0            $0                 $100,000         $0



                 FY 2022              $500,000              $0            $0                 $100,000         $0



                 FY 2021              $500,000              $0            $0                 $100,000         $750,000


                 FY 2020              $500,000              $500,000      $100,000           $300,000         $0



                Total Prior   Funding  $1,675,000           $1,050,000    $0                 $0               $100,000


                       Funding is requested for the  design and construction of   a new bridge along North   White Chapel Boulevard   over Kirkwood Creek   Branch.  This section of   roadway flooded in May   2015 due to heavy rainfall   and overflow from Lake   Grapevine and was closed  for approximately 7 weeks.     The road was overtopped   most recently September   2018 and underwent 6   months of repair before   reopening.  The plan for  FY 2020 is to complete the  flood and feas

                 Description                             Funding is requested for   engineering, design and  construction of drainage im- provements along Florence   Road. (Sutton Place Only)  Funding provides staff and   Council with resources to   reimburse developers for   the oversizing of storm  water lines to meet the re- quirements of the Southlake  2030 Water Master Plan in  cases where the developer   is not required to provide  the ultimate size of the line  to serve propos





                 Project Name    Kirkwood   Branch at   White Chapel   Road / South   Kirkwood   Branch at   White Chapel   Road  Florence   Road Drain-  age Improve-  ments  System   Capacity Im-  provements   (Storm Wa-  ter) - Future   Projects  Drainage Ba-  sin Enhance-  ments  Simmons   Court Drain-  age Improve-  ments/Ero-  sion Control



                                     Storm Wa-  ter Utility   System                        Storm Wa-  ter Utility   System
                 Fund                                     Storm Wa-  ter Utility   System  Storm Wa-  ter Utility   System  Storm Wa-  ter Utility   System


                 Project #            SWUSF4                SWUSF5        SWUSF6             SWUSF7           SWUSF8




                                               www.CityofSouthlake.com                                               403
   399   400   401   402   403   404   405   406   407   408   409