Street & Sidewalk Capital Projects
Project Name Project Description
TEXRail Signal Timing This project consists of signal timing coordination at the city's signalized intersections which will be impacted by railroad
Coordination - Continuing Project preemption as a result of the commuter rail.
Traffic Signalization at Davis This project consists of both the design and construction of a new traffic signal light at the intersection of Davis
Boulevard & Creek View Drive - Boulevard and Creek View Drive/Post Office drive entrance. The traffic signal light will conform to the City's current
Continuing Project standards which include black powder coated poles and mast arms, ILSN signs, opticom system, LED lights, video
detection system, and street lights mounted on the mast arms. The Post Office driveway will need to be realigned and
relocated to match the intersecting street of Creek View Drive. The Post Office parking lot configuration for entry and
parking will need to be reconfigured to match the new entrance.
Transportation Management This project consists of three components: software, engineering, and equipment that has been developed to improve
Project - New Project traffic signal efficiency, reduce technician response time, and improve level of service through our corridors. The main
component of the project is the central synchronization software that will provide a controller software storage platform
and remote communication with traffic signal equipment. Equipment necessary will include controllers, communication
equipment and video detection systems at some of the intersections. The system will operate using engineer-designed
timing plans that are the basis for the traffic signal coordination. The initial installation locations are planned for Davis
and Mid-Cities corridors and will incorporate traffic signals. The program would be expanded incrementally each year by
adding communication equipment and controllers until the entire signal system is connected.
Vance and Glenview Signal This project consists of replacing the existing span wire signal at the intersection of Vance Road and Glenview Drive
Upgrades - Continuing Project with pole mounted signals. This project also includes the installation of pedestrian signal heads and striping at the
intersection. This project has been approved for funding through the HSIP (Highway Safety Improvement Program)
grant which is 90% federal funding and 10% local funding. The 90% coverage of federal funds is only for construction
costs. This project will be let through TxDOT as the
grant is disseminated through TxDOT.
400