Street & Sidewalk Capital Projects



           Project Name                                      Project Description
         TEXRail Signal Timing   This project consists of signal timing coordination at the city's signalized intersections which will be impacted by railroad
         Coordination - Continuing Project  preemption as a result of the commuter rail.









         Traffic Signalization at Davis   This project consists of both the design and construction of a new traffic signal light at the intersection of Davis
         Boulevard & Creek View Drive -   Boulevard and Creek View Drive/Post Office drive entrance.  The traffic signal light will conform to the City's current
         Continuing Project     standards which include black powder coated poles and mast arms, ILSN signs, opticom system, LED lights, video
                                detection system, and street lights mounted on the mast arms.  The Post Office driveway will need to be realigned and
                                relocated to match the intersecting street of Creek View Drive.  The Post Office parking lot configuration for entry and
                                parking will need to be reconfigured to match the new entrance.





         Transportation Management   This project consists of three components: software, engineering, and equipment that has been developed to improve
         Project - New Project  traffic signal efficiency, reduce technician response time, and improve level of service through our corridors. The main
                                component of the project is the central synchronization software that will provide a controller software storage platform
                                and remote communication with traffic signal equipment. Equipment necessary will include controllers, communication
                                equipment and video detection systems at some of the intersections. The system will operate using engineer-designed
                                timing plans that are the basis for the traffic signal coordination. The initial installation locations are planned for Davis
                                and Mid-Cities corridors and will incorporate traffic signals. The program would be expanded incrementally each year by
                                adding communication equipment and controllers until the entire signal system is connected.


         Vance and Glenview Signal   This project consists of replacing the existing span wire signal at the intersection of Vance Road and Glenview Drive
         Upgrades - Continuing Project  with pole mounted signals. This project also includes the installation of pedestrian signal heads and striping at the
                                intersection. This project has been approved for funding through the HSIP (Highway Safety Improvement Program)
                                grant which is 90% federal funding and 10% local funding. The 90% coverage of federal funds is only for construction
                                costs. This project will be let through TxDOT as the
                                grant is disseminated through TxDOT.