Street & Sidewalk Capital Projects



           Project Name                                      Project Description
         Preventive Street Maintenance   This is an annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
         (2018) - Continuing Project  streets.  The scope of this project provides crack sealing for approximately 15-25 streets, slurry seals for 15-25 streets
                                and a 2" asphalt overlay for 12-15 streets.  In addition to these three maintenance methods, staff will be searching for
                                new preventive procedures to consider in the future.







         Preventive Street Maintenance   This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
         (2019) - Continuing Project  streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets
                                and a 2 inch asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for
                                new preventive procedures to consider in the future.







         Preventive Street Maintenance   This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
         (2020) - New Project   streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets
                                and a 2 inch asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for
                                new preventive procedures to consider in the future.







         Preventive Street Maintenance   This is for additional funds for the annual program where funds are dedicated to enhance the city's efforts for preventive
         (Multi-Year) - Continuing Project  maintenance of city streets. The scope of this project will provide for additional crack sealing, slurry seal and a 2 inch
                                asphalt overlay for identified City streets.








         Rufe Snow Dr. Street & Utility   This project widens approximately 5,300 feet of the existing 5-lane thoroughfare to 7-lanes.  This section of Rufe Snow
         Imp. (Mid-Cities to    Drive will be reconstructed as a concrete street with sidewalks along both sides, signalization improvements at the major
         Hightower)[TEA-21] - Continuing   intersections and all necessary water and sewer main adjustments.  The funding for design will be provided by the 1994
         Project                Bond Program and Federal Grants (TEA-21).  The funding for the construction phase of this project will come from the
                                2003 Bond Program and Federal Grants.






         Schiller Drive Road    This is the 44th Year Community Development Block Grant (CDBG) Project.  The project will consist of reconstructing
         Reconstruction (CDBG) -   the entire length (480 linear feet) of Schiller Drive.
         Continuing Project