Project Name Project Description
Preventive Street Maintenance This is an annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
(2018) - Continuing Project streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seals for 15-25 streets
and a 2" asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for
new preventive procedures to consider in the future.
Preventive Street Maintenance This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
(2019) - Continuing Project streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets
and a 2 inch asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for
new preventive procedures to consider in the future.
Preventive Street Maintenance This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
(2020) - New Project streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets
and a 2 inch asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for
new preventive procedures to consider in the future.
Preventive Street Maintenance This is for additional funds for the annual program where funds are dedicated to enhance the city's efforts for preventive
(Multi-Year) - Continuing Project maintenance of city streets. The scope of this project will provide for additional crack sealing, slurry seal and a 2 inch
asphalt overlay for identified City streets.
Rufe Snow Dr. Street & Utility This project widens approximately 5,300 feet of the existing 5-lane thoroughfare to 7-lanes. This section of Rufe Snow
Imp. (Mid-Cities to Drive will be reconstructed as a concrete street with sidewalks along both sides, signalization improvements at the major
Hightower)[TEA-21] - Continuing intersections and all necessary water and sewer main adjustments. The funding for design will be provided by the 1994
Project Bond Program and Federal Grants (TEA-21). The funding for the construction phase of this project will come from the
2003 Bond Program and Federal Grants.
Schiller Drive Road This is the 44th Year Community Development Block Grant (CDBG) Project. The project will consist of reconstructing
Reconstruction (CDBG) - the entire length (480 linear feet) of Schiller Drive.
Continuing Project