Page 407 - NRH FY20 Approved Budget
P. 407

Drainage Capital Projects



           Project Name                                      Project Description
         Street Drainage Improvements   The project would consist of addressing a portion of the numerous non-grade standing water requests Public Works
         Project (2019) - Continuing   receives each year.  This would be accomplished by removing and replacing curb and gutter systems to an adequate
         Project                grade that provides positive drainage along city streets. Creating positive drainage along streets can sometimes require
                                drive approaches and sidewalks to be replaced as well to accommodate the new grade.  The current list of requests
                                from citizens consist of 193 locations with an estimated cost of $640,000 to complete the entire list of locations to date.
                                This project could be considered an annual project until such time as the list of request is completed or until the entire
                                list can be accomplished.




         Street Drainage Improvements   This project will address a portion of the numerous non-grade standing water requests the Public Works Department
         Project (2020) - New Project  receives each year. This would be accomplished by removing and replacing curb and gutter systems to an adequate
                                grade that provides positive drainage along city streets. In some instances the replacement of drive approaches and
                                sidewalks will also need to be replaced to accommodate the new grade. the current list of requests from citizens consist
                                of 193 locations with an estimated cost of $640,000 to complete the entire current list of locations. This project will be an
                                annual project until the list of requests is completed.





         Walker Branch Channel Repair   The project consists of engineering and reconstructing approximately 400 feet of gabions along the Walker Branch
         (200ft South of Harwood Road) -   Channel. The project begins south of Harwood along the west bank and will focus on two areas where the gabion
         Continuing Project     baskets have failed.

























































                                                             403
   402   403   404   405   406   407   408   409   410   411   412