Enhance Regional Mobility


                          Goal 2: Plan, Manage, and Maintain Public Transportation Infrastructure
                           Objective 1: Optimize Effectiveness and Efficiency of Existing Transportation System
                        Project                  Performance Measure(s)           City Service Team (Department)
             ERM    IH‐30 and SH‐360       Overall satisfaction with the      Economic Development and Capital
             2.1.2   Interchange           management of traffic flow during peak   Investment (PWT)
                                           hours
             Summary:

             The purpose of this project is to improve traffic safety   Milestone     Estimated      Actual
             and reduce traffic congestion at the interchange of                     Completion    Completion
             Interstate 30 and State Highway 360.  Formerly a toll   Package A Construction  Spring 2022   Pending
             road loop interchange, the new infrastructure will   Package B Construction  Spring 2022   Pending
             include main lane improvements and direct         Package C Construction  Pending     Pending
             connection ramps to each facility.                Package D Construction  Pending     Pending
                                                               Package E Construction  Summer 2020   Pending
             This project is split into five construction phases.
             Package A is reconstructing the Six Flags Drive Bridge
             over IH‐30 and will be bid as a joint project with the
             IH‐30/SH‐360 Interchange Project (Package B).
             Package C is the Great Southwest Industrial District
             railroad bridge crossing just south of Randol Mill Road.
             Package D includes the Randol Mill Road interchange
             improvements and Package E includes improvements
             from Abram Street to IH‐20.

             Update:
             Contractors for the Texas Department of
             Transportation (TxDOT) opened the westbound
             frontage road under Ballpark Way. The westbound
             collector/distributor to southbound Ballpark Way has
             also opened.

             Due to construction delays, the estimated completion
             for the entire project has been revised to Spring 2022.
             City staff is continuing to coordinate with TxDOT and
             its contractors on expediting the construction phasing.
























                                                             25