Drainage Capital Projects



           Project Name                                      Project Description
        Calloway Branch Channel   This is for the repair of failing channel along the Calloway Branch Channel that has resulted in the loss of material in
        Repair Project -    several backyards along Waggoner Ranch Road. Erosion caused by excessive rains following the years of recent drought
        Continuing Project  caused bank failure along the west bank of the Calloway Branch channel adjacent to the Graham Ranch subdivision.  This
                            project will restore the west bank in the vicinity of the Graham Ranch properties and fortify the bank to prevent a future
                            recurrence.  Because the project is located within FEMA's regulatory floodway, both a CLOMR and LOMR will be required.









        Emerald Circle Drainage   This project consists of extending an underground storm drain system in the Emerald Lakes subdivision.
        Project - New Project













        Snow Heights Drainage   The area along the eastbound Loop 820 frontage road, east of Rufe Snow Drive was developed decades ago with no
        Improvements Project -   underground drainage improvements. As a result the area becomes inundated during moderate rainfall events. The
        Continuing Project  proposed underground storm drain system will provide capacity for almost 11 acres of commercially zoned property and ties
                            into the storm drain improvements installed by TxDOT during the North Tarrant Express highway project several years ago.
                            The scope of the project includes the installation of aproximately 1,2000 linear feet of concrete drainage pipe with intake
                            structures.








        Street Drainage     The project would consist of addressing a portion of the numerous non-grade standing water requests Public Works
        Improvements Project   receives each year.  This would be accomplished by removing and replacing curb and gutter systems to an adequate grade
        (2019) - New Project  that provides positive drainage along city streets. Creating positive drainage along streets can sometimes require drive
                            approaches and sidewalks to be replaced as well to accommodate the new grade.  The current list of requests from citizens
                            consist of 193 locations with an estimated cost of $640,000 to complete the entire list of locations to date.  This project
                            could be considered an annual project until such time as the list of request is completed or until the entire list can be
                            accomplished.







        Walker Branch Channel   The project consists of engineering and reconstructing approximately 400 feet of gabions along the Walker Branch
        Repair (200ft South of   Channel. The project begins south of Harwood along the west bank and will focus on two areas where the gabion baskets
        Harwood Road) -     have failed.
        Continuing Project