P. 467
Utility Capital Projects
Project Name Project Description
Motor Operated Transfer This project consists of motor operated valves to be placed on existing water lines at three locations along Holiday Lane,
Valves - Continuing Thaxton Parkway, and Boulevard 26.
Project
Sanitary Sewer Line This project will consist of pipe bursting 1,790 linear feet of 6 inch clay pipe on Crabtree Ln. ( 6900 Block thru 7000 Block).
Replacements (Crabtree The project will also replace a 6 inch ductile iron sewer main that crosses the storm drainage channel on Onyx Dr. N. (Kris
& Onyx N.) - Continuing Street thru Charles Street ).
Project
Sanitary Sewer System This project will consist of replacing approximately 1,200 linear feet of sanitary sewer main lines in North Richland Hills. In
Rehabilitation (Various addition five manholes will be replaced. Streets included in this project will be Nancy Lane (4900 to 5000 block); 8020
Locations) - Continuing Laura Street to 8017 Lazy Street; and 7000 to 7028 Smithfield Road.
Project
Sanitary Sewer System This project will reconstruct approximately 550 feet of 18 inch sanitary sewer line. The line is located near the drainage
Trunk Line ditch and channel for Mackey Creek. The project will start at the existing line located near Jackie Lee and end near
Rehabilitation - Harmonson Road.
Continuing Project
Sewer Manhole This project will replace or rehabilitate roughly 150 sewer manholes identified as needing replacement.
Replacement and
Rehabilation Project -
New Project