           Project Name                                      Project Description
        Motor Operated Transfer   This project consists of motor operated valves to be placed on existing water lines at three locations along Holiday Lane,
        Valves - Continuing   Thaxton Parkway, and Boulevard 26.
        Project












        Sanitary Sewer Line   This project will consist of pipe bursting 1,790 linear feet of 6 inch clay pipe on Crabtree Ln. ( 6900 Block thru 7000 Block).
        Replacements (Crabtree   The project will also replace a 6 inch ductile iron sewer main that crosses the storm drainage channel on Onyx Dr. N. (Kris
        & Onyx N.) - Continuing   Street thru Charles Street ).
        Project











        Sanitary Sewer System   This project will consist of replacing approximately 1,200 linear feet of sanitary sewer main lines in North Richland Hills. In
        Rehabilitation (Various   addition five manholes will be replaced. Streets included in this project will be Nancy Lane (4900 to 5000 block);  8020
        Locations) - Continuing   Laura Street to 8017 Lazy Street; and 7000 to 7028 Smithfield Road.
        Project










        Sanitary Sewer System   This project will reconstruct approximately 550 feet of 18 inch sanitary sewer line. The line is located near the drainage
        Trunk Line          ditch and channel for Mackey Creek. The project will start at the existing line located near Jackie Lee and end near
        Rehabilitation -    Harmonson Road.
        Continuing Project










        Sewer Manhole       This project will replace or rehabilitate roughly 150 sewer manholes identified as needing replacement.
        Replacement and
        Rehabilation Project -