Page 468 - Cover 3.psd
P. 468
Utility Capital Projects
Project Name Project Description
Small Water Main This is an annual program that is completed by the Public Works Construction Division. The project replaces old 2" and 4"
Replacements (2017) - water mains with 6" or larger water pipes and provides adequate fire hydrant coverage to areas currently without proper
Continuing Project coverage. This project will provide for small water main replacement on the following streets: Circleview Dr. (Lariat to
Shady Lake), Meadow Ct. (Lola to cul-e-sac), Meadowbrook Dr. (Royal Ridge to Brookridge), Woodcreek Ln. (Lariat to
Riviera), and Spring Lea Way (Starnes to Lincoln).
Small Water Main This is an annual program that is completed by the Public Works Construction Division. The project replaces old 2" and 4"
Replacements (2018) - water mains with 6" or larger water pipes and provides adequate fire hydrant coverage to areas currently without proper
Continuing Project coverage. This project will provide for small water main replacement on a number of streets yet to be determined.
Small Water Main This is an annual program that is completed by the Public Works Construction Division (407-6007). The project replaces
Replacements (2019) - old 2" and 4" water mains with 6" or larger diameter water pipes. This project provides adequate fire hydrant coverage to
New Project areas currently without proper coverage. This project will provide for small water main replacement on the following
streets: Freda Lane (Pearl to Newman), Davis Boulevard (Woods to Bursey), Circleview Drive (Lariat to Shady Lake),
Meadowbrook Drive (Royal Ridge to Brookridge) and Woodcreek Lane (Lariat to Riviera).
Telemetric Water Meter The Telemetric Water Meter Annual Maintenance Program allows the City to continue replacing some of the transponder
Annual Maintenance units and meters installed 10 years ago. The new transponder units transmit meter information to a mobile receiver or fixed
(2018) - Continuing network which reduces and eventually eliminates the need for manual reading. Each meter with transponder cost $250 to
Project replace and the City replaces about 1,500 per year.
Telemetric Water Meter The Telemetric Water Annual Maintenance Program allows the City to continue replacing some of the transponder units
Annual Maintenance and meters installed 10 years ago. The new transponder units transmit meter information to a mobile receiver or fixed
(2019) - New Project network reducing and eventually eliminating the need for manual readings. Each meter with transponder costs $270 to
replace and the City replaces roughly 1,400 per year.
462