Page 466 - Cover 3.psd
P. 466
Utility Capital Projects
Project Name Project Description
Large Valve Replacement The Large Water Valve Replacement Project encompassed the replacement of two, 24 inch valves, a 12 inch valve, and
Project - New Project the installation of a 16 inch valve. The 24 inch valve replacements are located at the intersections of Hightower and
Smithfield Road and Hightower and Davis Boulevard. The 12 inch valve replacement is located at Davis Boulevard and
Odell Street. The installation of the 16 inch valve will be near the intersection of Glenview Drive and Dawn Drive.
Main / Snider / Center The project consists of engineering and construction of water and sanitary sewer main extensions to provide service to
Utility Project - New properties north and south of Main Street off of Snider Street and Center Street in the TOD.
Project
Miscellaneous This is an annual program that is completed by the Public Works Construction Division (407-6007). The program will
Water/Sewer Main provide for water and sewer main replacements including any developmental projects. The project replaces aging
Replacement (2019) - infrastructure and maintains high standards for water quality. This will include replacements on the following streets:
New Project Whitfield Court (Holiday to Culd-de-sac), Lariat Trail (Meadowridge to Meadow Lakes), Southampton Drive ( Wakefield to
Chapman), and Holiday Court (Green Meadows to Cul-de-sac).
Miscellaneous This is an annual program that is completed by the Public Works Construction Division. The program will provide for water
Water/Sewer Main & sewer main replacements on the following streets: Whitfield Ct (Holiday to Cul-de-sac), Bogart Dr (College to Price),
Replacements (2017) - Little Ranch Rd (Steward to Sandhurst Ln South), Southampton Dr (Wakefield to Chapman), and Holiday Ct (Green
Continuing Project Meadows to Cul-de-Sac).
Miscellaneous This is an annual program that is completed by the Public Works Construction Division. The program will provide for water
Water/Sewer Main & sewer main replacements along a number of streets yet to be determined.
Replacements (2018) -
Continuing Project
460