Page 461 - Cover 3.psd
P. 461

Street & Sidewalk Capital Projects



           Project Name                                      Project Description
        Traffic Signalization at   This project consists of both the design and construction of a new traffic signal light at the intersection of Davis Boulevard
        Davis Boulevard & Creek   and Creek View Drive/Post Office drive entrance.  The traffic signal light will conform to the City's current standards which
        View Drive - Continuing   include black powder coated poles and mast arms, ILSN signs, opticom system, LED lights, video detection system, and
        Project             street lights mounted on the mast arms.  The Post Office driveway will need to be realigned and relocated to match the
                            intersecting street of Creek View Drive.  The Post Office parking lot configuration for entry and parking will need to be
                            reconfigured to match the new entrance.








        Vance and Glenview   This project consists of replacing the existing span wire signal at the intersection of Vance Road and Glenview Drive with
        Signal Upgrades -   pole mounted signals. This project also includes the installation of pedestrian signal heads and striping at the intersection.
        Continuing Project  This project has been approved for funding through the HSIP (Highway Safety Improvement Program) grant which is 90%
                            federal funding and 10% local funding. The 90% coverage of federal funds is only for construction costs. This project will be
                            let through TxDOT as the
                            grant is disseminated through TxDOT.


























































                                                             455
   456   457   458   459   460   461   462   463   464   465   466