Page 461 - Cover 3.psd
P. 461
Street & Sidewalk Capital Projects
Project Name Project Description
Traffic Signalization at This project consists of both the design and construction of a new traffic signal light at the intersection of Davis Boulevard
Davis Boulevard & Creek and Creek View Drive/Post Office drive entrance. The traffic signal light will conform to the City's current standards which
View Drive - Continuing include black powder coated poles and mast arms, ILSN signs, opticom system, LED lights, video detection system, and
Project street lights mounted on the mast arms. The Post Office driveway will need to be realigned and relocated to match the
intersecting street of Creek View Drive. The Post Office parking lot configuration for entry and parking will need to be
reconfigured to match the new entrance.
Vance and Glenview This project consists of replacing the existing span wire signal at the intersection of Vance Road and Glenview Drive with
Signal Upgrades - pole mounted signals. This project also includes the installation of pedestrian signal heads and striping at the intersection.
Continuing Project This project has been approved for funding through the HSIP (Highway Safety Improvement Program) grant which is 90%
federal funding and 10% local funding. The 90% coverage of federal funds is only for construction costs. This project will be
let through TxDOT as the
grant is disseminated through TxDOT.
455