Street & Sidewalk Capital Projects



           Project Name                                      Project Description
        Preventive Street   This is an annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
        Maintenance (2017) -   streets.  The scope of this project provides crack sealing for approximately 15-25 streets, slurry seals for 15-25 streets and
        Continuing Project  a 2" asphalt overlay for 12-15 streets.  In addition to these three maintenance methods, staff will be searching for new
                            preventive procedures to consider
                            in the future.









        Preventive Street   This is an annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
        Maintenance (2018) -   streets.  The scope of this project provides crack sealing for approximately 15-25 streets, slurry seals for 15-25 streets and
        Continuing Project  a 2" asphalt overlay for 12-15 streets.  In addition to these three maintenance methods, staff will be searching for new
                            preventive procedures to consider in the future.











        Preventive Street   This is the annual program where funds are dedicated to enhance the city's efforts for preventive maintenance of city
        Maintenance (2019) -   streets. The scope of this project provides crack sealing for approximately 15-25 streets, slurry seal for 15-25 streets and a
        New Project         2 inch asphalt overlay for 12-15 streets. In addition to these three maintenance methods, staff will be searching for new
                            preventive procedures to consider in the future.










        Preventive Street   This is for additional funds for the annual program where funds are dedicated to enhance the city's efforts for preventive
        Maintenance (Multi-  maintenance of city streets. The scope of this project will provide for additional crack sealing, slurry seal and a 2 inch
        Year) - New Project  asphalt overlay for identified City streets.











        Rufe Snow Dr. Street &   This project begins at Karen Drive and ends on the north side of Corona Drive (approximate ending of the TxDOT Bridge
        Utility Imp. (Karen Drive   project).  The intersection at Meadowlakes Drive will be improved as part of this project.  Rufe Snow Drive will be widened
        to I.H. 820) - Continuing   with right turn lanes and improved signalization.  This section will transition from the wider section at the bridge to the 4 lane
        Project             section at Karen Drive. The project will be constructed as a concrete street with sidewalks and all necessary water and
                            sewer main adjustments. Street lights and signalization at Meadow Lakes will be constructed to the City's standards.