Leverage Technology

                           Goal 1: Ensure Availability of Information, Programs, and City Services
                                             Objective 2: Implement New Technology
                         Project                      Performance Measure(s)                Department(s)
             LT     Traffic Management       • Installing Devices at Locations and Bringing  Public Works
             1.2.15  Technology Improvements    them Online. Use Crowdsourced Data and
                                                GIS database for Travel Time Data
                                                Collection and Evaluation
                                             • Using Device Data to Improve Traffic Flow
             Summary:
                                                                                                       Actual
                                                                    Corridor Travel Time Goals
             Implementing smart traffic management technology                                       Travel Time
             will assist the city in developing a more efficient   NB Cooper St. (Turner-Warnell Rd. to I-30)   21:43
             transportation system that enhances regional mobility   23:21 (+/- 2 min 20 sec)
             and increases the quality of life for residents and   SB Cooper St. (I-30 to Turner-Warnell Rd.)   22:28
             visitors.                                       22:07 (+/- 2 min 13 sec)
                                                             NB Collins St. (Mansfield Webb Rd. to Mosier   26:49
             Some of the benefits resulting from implementing new   Valley Rd.) 28:31 (+/- 2 min 51 sec)
             technology include:                             SB Collins St. (Mosier Valley Rd. to Mansfield   27:38
                 •  Reduced traffic congestion               Webb Rd.) 26:16 (+/- 2 min 38 sec)
                 •  Prioritized traffic based on real-time   EB Division St. (West City Limit to East City   17:39
                    conditions                               Limit) 15:57 (+/- 1 min 36 sec)
                 •  Quicker response to traffic incidents    WB Division St. (East City Limit to West City   17:31
                 •  Reduced pollution                        Limit) 15:46 (+/- 1 min 35 sec)
                                                             EB Pioneer Pkwy. (West City Limit to East City   16:41
             During FY 2025, work to implement new traffic   Limit) 17:12 (+/- 1 min 43 sec)
             management technology will focus on the following   WB Pioneer Pkwy (East City Limit to West   15:51
             prioritized actions:                            City Limit) 16:16 (+/- 1 min 38 sec)

             1) Enhanced Traffic Monitoring and Management:
                 •  Installation of Additional CCTV Cameras on   Traffic Management     Estimated    Actual
                    Major Corridors.                            Improvement Projects   Completion   Completion
                 •  Relocation and Enhancement of the Traffic  Installation of additional   Sept. 2025
                    Management Center (TMC).                  connected vehicle devices
             2) Infrastructure Upgrades:                      Installation of additional   Sept. 2025
                 •  Installation of Connected Vehicle Devices on  CCTV cameras for traffic
                    Major Corridors.                          monitoring
             3) Traffic Optimization Solutions:               Evaluation of the existing   May 2025
                 •  A thorough evaluation of existing Intelligent  ITS and prioritized solutions
                    Transportation Systems (ITS) to identify areas  for implementation
                    for improvement and incorporating new     Relocating the Traffic   Jan. 2026
                    technologies to enhance traffic management.  Management Center (TMC)
             4) Work Zone and Event Management:               Implementation of work   Sept. 2025
                 •  Implementation of Work Zone Management    zone management
                    Software One. Network and revising the    software
                    Traffic Control Permit process.
                                                            Update:
                                                            Public Works has started Phase 2 of implementing
                                                            One.Network for the department’s traffic control process.
                                                            Traffic Engineering is also initiating the RFP Process for
                                                            procurement of solutions from the ITS Evaluation project.