Page 87 - CityofHaltomFY24Budget
P. 87

City Of Haltom City Annual Budget, Fy2024  General Fund  City Of Haltom City Annual Budget, Fy2024  General Fund


 STREET AND DRAINGE
                                                                  Actual     Adopted      Projected     Adopted
 Mission Statement  EXPENDITURES                                 FY 2022     FY 2023       FY 2023      FY 2024
           Personnel                                             $593,703      $917,664      $748,954    $988,526
 To perform maintenance of streets, drainage and traffic control systems in a manner that will   Operations  548,520  521,100  508,100  606,854
 provide for the safe and efficient movement of traffic and to ensure flow of storm water through   Capital  33,039  635,000  635,000  102,670
 the enclosed drainage collection system.  Total                $1,175,262   $2,073,764    $1,892,054   $1,698,050


 The Street Maintenance Department general duties and responsibilities include: maintain and      Actual  Adopted   Projected  Adopted
 repair streets, sweep streets and curbs, maintain and install traffic control devices (signs, signals   STAFFING  Class Range  FY 2022  FY 2023  FY 2023  FY 2024
                                                                                                          0.5
           Street Maintenance Supervisor
                                                                                             0.5
                                                                               0.5
                                                                   0.5
                                                    2901
                                                           64
 and pavement markings), maintain and mow city owned properties.  Public Works Crewleader  2905  49  2  2  2  2
           Senior Equipment Operator                2906   44       2           2             2            2
 Accomplishment of FY2023  Sign Specialist          2909   44       1           1             1            1
           Equipment Operator                       2910   41       3           3             3            3
           Public Works Maintenance Worker          2911   37       3           3             3            3
 •  Coordinated  with Tarrant County  Precinct 4 on major  rehabilitation  of Old Denton  Road   Sign Technician  2913  41  1  1  1  1
 (North Beach Street to north of Waste Connections).  Project was an area of 10,752 square   Total  12.5  12.5  12.5  12.5
 yards and included 8 inches thick of Lime treated Subgrade, the placement of 2,080 tons of
 Type B (Binder), and 1,318 tons of Type D (Surface) asphalt.
 •  Removed and replaced 404 linear feet of curb and gutter, 5 drive approaches, then removed,   PERFORMANCE MEASURES  Actual   Actual   Actual   Target
 and replaced 499 square yards of subgrade at a depth of 6 inches, with 3 inches of Type D   Tons of asphalt utilized in patching projects  FY2021  FY2022  FY2023  FY2024
                                                                                   1,300
                                                                                                          1,700
                                                                        1,591
                                                                                               4,768
 (Surface) asphalt at a total of 93 tons on Ridgemont Drive.  Tons of cold mix used in pothole patching  18  14  11  20
 •  Removed and Replaced 180 linear feet of curb and gutter, 26’x 8’ water valley crossing   Traffic signal repair work orders completed   298  431  265  250
            Goal 6:  Address Critical
                                                                         211
                                                                                                           200
                                                                                               156
                                                                                    218
 Ridgemont at the intersection with Glenview Drive, 586 square yards of subgrade at 6 inches   Facility & Infrastructure   Regulatory Signs replaced  0.50  0.50  0.25  0.50
                                Miles of lane crack-sealed
 in depth, then placed 127 tons of Type D (Surface) asphalt at 4 inches thick.  Needs  Miles of lane over-layed with asphalt  0.23  0.15  0.10  0.25
 •  Replacement of 1/8 of a mile lane of concrete in the 4700 block of Western Center Boulevard.  Miles of lane replaced at full-depth with asphalt  0.56  0.00  1.22  0.25
 •  Replaced 182 Tons of Type B (Binder) and 151 tons of Type D (Surface) asphalt in the 4100   Miles of streets swept  1,813  2,405  1,748  2,200
                                                                                    367
                                                                                               1,468
                                                                                                          1,300
                                                                        1,811
                                Feet of concrete curb replaced
 block of Patricia.
 •  Replaced 156 regulatory Signs
 •  Made 265 repairs to the City’s traffic signals
 •  Swept 1,748 curb miles of streets  Tons of Asphalts Utilized            Sign Replaced and Streets Swept
            3,000
 Objectives for FY2024
            2,500                                                 200                                        3,000
 •  Reeves Street – remove and replace ~20,000 square feet of asphalt in the 3400 block of   2,405   2,200   2,500
 Reeves and the corresponding subgrade work.  2,000               150    1,813              1,748
 •  Marlene Street  -  remove and replace 2 drive approaches, water valley crossing Loch                     2,000
 Lomond, 395 linear feet of curb and gutter in the 5700 block.  1,500  100                                   1,500
 •  Crack Seal 4+ lane miles of city streets                       50                                        1,000
 •  Mill and overlay 0.25 miles of city streets  1,000                                                       500
 •  Remove and replace full depth asphalt for 0.25 miles of city streets  500  0  211  218  156       200    0
 •  Replace 200 feet of sidewalk throughout the city for safer passage for pedestrians.  2021  2022  2023  2024
 •  Upgrade the traffic signals backup system at the intersection of Browning Drive and Dunson   0  1,591   1,300   4,768   1,700
 Drive.              2021       2022       2023        2024                      Regulatory Signs Replaced
 •  Redesign the intersection of Haltom Road and Glenview Drive to incorporate ADA Ramps   Asphalt Patching Projects  Miles of Streets Swept
 and crosswalks
 •  Add a School Flasher for Elementary School students crossing near Gene Lane and Jerri
 Street.
   82   83   84   85   86   87   88   89   90   91   92