CAPITAL IMPROVEMENTS  PROGRAM (CIP)

                                   WATER


                          Funding   Total Prior                                               Beyond /
           Project number                    FY 2023   FY 2024   FY 2025  FY 2026   FY 2027               Total
                          Source   Funding                                                   Unfunded
          Repainting of   Funding is planned to repaint the Florence Elevated Storage Tank. The paint on the water tower is from the original
          the Florence
          Elevated Storage   construction in 2005, with an expected life of 20 years. Though inspections have identified minor deterioration on the interior,
                        these issues can be addressed individually.  The interior and exterior coatings are still in good shape.
          Tank
          2022-37       Utility Fund      $0       $0        $0   $300,000  $1,150,000    $0        $0   $1,450,000


          Repainting of the
          Dove Elevated   Funding is planned to repaint the Dove Elevated Storage Tank. The paint on the water tower was applied in 2006.
          Storage Tank

          2022-39       Utility Fund      $0       $0        $0        $0  $325,000  $1,200,000     $0   $1,525,000


          Repainting of the
          Bicentennial Park  Funding is planned to repaint the Bicentennial Park Elevated Storage Tank. The paint on the water tower was applied in
                        2007.
          Storage Tank
          2022-40       Utility Fund      $0       $0        $0        $0       $0   $350,000  $1,250,000  $1,600,000



          12-inch Water
          line along Randol  Funding is planned for right of way, engineering design and construction to upsize an existing 8-inch water line to 12-inch
          Mill Avenue from
          Morgan Road to   along Randol Mill Avenue from Morgan Road to Dove Road.
          Dove Road

          2022-33c      Utility Fund      $0       $0        $0        $0  $195,000  $2,175,000     $0   $2,370,000
                        Water
          2022-33c      Impact Fee        $0       $0        $0   $250,000  $130,000      $0        $0    $380,000

                        Total             $0       $0        $0   $250,000  $325,000  $2,175,000    $0   $2,750,000


          12-inch Water
          line along North
          Peytonville from   Funding is planned for right-of-way, engineering design and construction of a 12-inch water line along North Peytonville from
                        Concho Court to Southridge Lakes Parkway to increase capacity in this region and to compensate for development and
          Concho Court to
          Southridge Lakes  growth.
          Parkway
          2022-36c      Utility Fund      $0       $0   $200,000  $250,000  $2,850,000    $0        $0   $3,300,000

                        Water
          2022-36c                        $0       $0   $100,000       $0                 $0        $0    $100,000
                        Impact Fee
                        Total             $0       $0   $300,000  $250,000  $2,850,000    $0        $0   $3,400,000


         Water Total               $16,405,170  $2,555,000  $4,257,750 $10,955,000 $12,768,000  $5,020,000 $17,872,000 $69,832,920