Supply And Distribution Requests
Itemized Requests for 2023-2033
SWIFT Water Line Replacement - Bedford Road 20-inch Transmission Line (EM Bilger to Forest Ridge) an d $3, 350,000
Bedford Road 8-inch water main renewal (Central Drive to SH 183)
Many of the water lines in the City of Bedford are 30 plus years old and are rapidly deteriorating. Many of the water lines
that will be replaced have had multiple breaks, placing customers without service and water loss. This large project will...
SWIFT Water Line Replacement - Patricia, Glenda to Dora $936 ,000
Many of the water lines in the City of Bedford are 30 plus years old and are rapidly deteriorating. Many of the water lines
that will be replaced have had multiple breaks, placing customers without service and water loss. This large project will...
SWIFT Water Line Replacement - Rankin Drive, Wade Drive to Overhill Drive $1,976 ,000
Many of the water lines in the City of Bedford are 30 plus years old and are rapidly deteriorating. Many of the water lines
that will be replaced have had multiple breaks, placing customers without service and water loss. This large project will...
SWIFT Water Line Replacement - Shady Elm Cour t , off Shady Brook Drive $113,500
Many of the water lines in the City of Bedford are 30 plus years old and are rapidly deteriorating. Many of the water lines
that will be replaced have had multiple breaks, placing customers without service and water loss. This large project will...
Total: $6,375,500
Parks Requests
Itemized Requests for 2023-2033
Front End Loader Replacement $120,000
The current unit is 30 years old and has outlived its life expectency. This request will replace the current unit with a heavy
duty Case321F front wheel loader that will enhance productivity and get the job done quickly, easily and...
Meadowpark Ball{eld Lighting Replacement $800,000
The Ball elds lights are in dire need of replacement. The lighting system is unoperable, for safety reasons. They were
installed in 1983 and due to weather exposure, use and age, the system has outlived its life expectancy.
Meadowpark Fencing Replacement $100,000
The fencing at Meadow Park was installed in 1983 and is in need of replacement.
Park Ser vice Center Perimeter Fencing $15,000
The wood fencing at the back of the Park Service Center has become unsecure and is in need of replacement.
Performing Ar ts Center $ 4 ,000,000
On November 7, 2017, Bedford voters approved a bond proposition to construct, renovate and equip park and recreation
facilities within the Boys Ranch Park, also known as Phase Next. As part of this capital improvement, an arts and
entertainment...
Stormie Jones Soccer Field Fencing Replacement $100,000
Fencing replacement is needed at Stormie Jones soccer elds. This will protect the elds from missuse, along with raising
the aesthetics of those elds.
Total: $5,135,000