Police Requests


             Itemized Requests for 2023-2033

             Traf{c Motorcycle Replacement                                                                $90,055
              The current  eet of  ve traf c motorcycles was purchased in FY2017/18 utilizing a four-year  nance agreement.
              Replacement of the bikes was to occur in FY2021/22 but instead was postponed to FY2022/23 to extend the cost savings.
              This request...

                                                                                                   Total:  $90,055


            Library Requests

             Itemized Requests for 2023-2033

             Automated Materials Handling and CircIT Ser ver                                               $9,560
              The Library automated materials handling system server was purchased in 2014. The automated materials handling
              system acts as the brains for the industrial-grade sortation system. The server needs to be upgraded to a Windows 10 LTSC
              (2019)....
             Carpet Replacement in Adult Area                                                             $70,000
              The carpet in the Adult Area of the Library was installed in 2011. It is faded, stained, and worn out due to the high traf c
              which is the  rst thing patrons see as they enter the library. The Library is rotating carpet replacement in separate...
             Firewall Replacement                                                                          $17,120
              The existing  rewall needs to be replaced with a new Palo Alto 460  rewall. This will allow the library’s public internet
              access to use the full bandwidth of the AT&T circuit in place. The current  rewall is only capable of processing...
             RFID Security Gates                                                                          $13,520
              The current RFID security gates for the library were purchased in 2010. The manufacturer has discontinued this model and
              obtaining replacement parts is increasingly dif cult. The new Wave gates are sourced from Feig Technologies, a German...

                                                                                                   Total:  $110,200


            Information Systems Requests

             Itemized Requests for 2023-2033

             Core Network Switches and Firewall replacement city wide                                    $ 425,000
              The current hardware will be end of life in the next 3-4 years. We have 39 switches and 2  rewalls that will need to be
              replaced sometime in the next 3-4 years.

             Desktop Computer Replacement                                                                $274 ,500
              The city currently has 183 Lenovo desktops that are reaching 7-8 years old. The current version of Windows 11 will not run on
              these devices due to TPM requirements. They are under powered, lack memory resources and are out...


                                                                                                  Total:  $699,500