Page 418 - Bedford-FY22-23 Budget
P. 418

Facilities Maintenance Requests


             Itemized Requests for 2023-2033

             Building C Roof Replacement                                                                 $163, 250
              The roof on Building C has reached its life span and is in need of replacement. The roof membrane is in a brittle state that
              indicates that it has reached its life span.

             City Hall Building A Roof Replacement                                                       $364 ,180
              This request is to replace the roof system on Building A at City Hall.  The project quote includes the following services:
              Remove existing roo ng and  ashings Remove existing Gypsum to Purlins Install new B Type 22-gauge...

             City Hall Building B Roof Replacement                                                        $89,900
              The roof on Building B has reached its life span and is in need of replacement. There is a signi cant amount of ponding
              water on the roof. Ponding water breaks down the roof membrane and leads to failures. It is recommended that an
              acrylic...

                                                                                                   Total:  $617,330





























































                City of Bedford, TX | Adopted Budget FY 2023                                               Page 418
   413   414   415   416   417   418   419   420   421   422   423