Page 418 - Bedford-FY22-23 Budget
P. 418
Facilities Maintenance Requests
Itemized Requests for 2023-2033
Building C Roof Replacement $163, 250
The roof on Building C has reached its life span and is in need of replacement. The roof membrane is in a brittle state that
indicates that it has reached its life span.
City Hall Building A Roof Replacement $364 ,180
This request is to replace the roof system on Building A at City Hall. The project quote includes the following services:
Remove existing roo ng and ashings Remove existing Gypsum to Purlins Install new B Type 22-gauge...
City Hall Building B Roof Replacement $89,900
The roof on Building B has reached its life span and is in need of replacement. There is a signi cant amount of ponding
water on the roof. Ponding water breaks down the roof membrane and leads to failures. It is recommended that an
acrylic...
Total: $617,330
City of Bedford, TX | Adopted Budget FY 2023 Page 418

