Public Works Requests
Itemized Requests for 2023-2033
Cummings Water Tower Rehabilitation $2 , 800,000
The Cummings tower is in need of rehabilitation on both the inside and the outside of the water tower due to non-
compliance with updated regulations set forth by the Texas Commission on Environmental Quality (TCEQ) and the Federal
government. The...
Drainage - Erosion Control Sulphur Branch & Sulphur Branch Tributary, Second Phas e of Brookhollow Park $2 ,151, 288
A section of the concrete channel wall adjacent to Brookhollow Park, from Rankin Drive to the pedestrian bridge, collapsed
in February 2018 during heavy rainstorms. Various other sections were also compromised. The project consists of the...
Drainage - Sulphur Branch Channel Improvements SH 183 to Bedford Road $1,900,000
Drainage - Sulphur Branch Channel Improvements SH 183 to Bedford Road Kimley Horn (Misty) did the design for this
project around 2008. The design will need to be updated.
Drainage - Rankin Drive (Forest Ridge Drive to Storm Drain) $320,000
Drainage - Rankin Drive (Forest Ridge Drive to Storm Drain)
Drainage - Sulphur Branch Tributary Culver t Improvements at Bridges (Briar Drive, Shirley Way, Circle Lan e, $655,000
Schumac Lane, and Donna Lane)
Culvert improvements at bridge headwalls on Briar Drive, Shirley Way, Circle Lane, Schumac Lane, and Donna Lane. Briar -
Design ($35,000 in FY 23), Construction ($260,000 in FY 25) Shirley - Design ($40,000 in FY 24), Construction...
Drainage - System Wide Drainage Study $500,000
This project will consist of a system-wide drainage study to determine the hydraulic loading within the drainage system
during rain events.
SIEDC - Bedford Heights Addition [ Wayne, Har wood Terrace, Shady Brook (SS)] $1,586 ,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Bedford Road Phase 1 (Hurst City Limits to Brown Trail) $335,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Bedford Road Phase 2 (Brown Trail to SH 183/ 121) $ 430,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Bedford Road Phase 3 (SH 183/ 121 to Central Drive) $670,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Bell Manor Addition and Forest Ridge No 2 Addition $2 , 200,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Bellvue No 3 Addition (Glenda, Pat ricia, Hurst) $2 , 300,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Brook Hollow Addition (Robindale, Mar tha, Avinell, etc) $362 ,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Brown Trail (Har wood Road to Pipeline Road) $7,500,000
Reconstruction, reclamation, and mill/overlay for various streets.
SIEDC - Cheryl Avenue $73,000
Reconstruction, reclamation, and mill/overlay for various streets.
City of Bedford, TX | Adopted Budget FY 2023 Page 414