Enhance Regional Mobility
Goal 2: Plan, Manage, and Maintain Public Transportation Infrastructure
Objective 1: Optimize Effectiveness and Efficiency of Existing Transportation System
Project Performance Measure(s) Department(s)
ERM IH‐30 and SH‐360 Interchange Overall satisfaction with the Public Works & Transportation
2.1.2 management of traffic flow during
peak hours
Summary:
Milestone Estimated Actual
The purpose of this project is to improve traffic safety
and reduce traffic congestion at the interchange of Completion Completion
Package A Construction Spring 2022
Interstate 30 and State Highway 360. Formerly a toll
road loop interchange, the new infrastructure will Package B Construction Spring 2022
include main lane improvements and direct Package C Construction Pending
connection ramps to each facility. Package D Construction Pending
Package E Construction Summer 2020 Apr. 2021
This project is split into the following five
construction phases:
Package A: Reconstruction of the Six Flags
Drive Bridge over IH‐30
Package B: IH‐30/SH‐360 interchange
improvements
Package C: Great Southwest Industrial
District railroad bridge crossing just south of
Randol Mill Road
Package D: Randol Mill Road interchange
improvements
Package E: Improvements from Abram
Street to IH‐20