Enhance Regional Mobility
Goal 2: Plan, Manage, and Maintain Public Transportation Infrastructure
Objective 1: Optimize Effectiveness and Efficiency of Existing Transportation System
Project Performance Measure(s) City Service Team (Department)
ERM IH‐30 and SH‐360 Overall satisfaction with the Economic Development and Capital
2.1.2 Interchange management of traffic flow during peak Investment (PWT)
hours
Summary:
The purpose of this project is to improve traffic safety Milestone Estimated Actual
and reduce traffic congestion at the interchange of Completion Completion
Interstate 30 and State Highway 360. Formerly a toll Package A Construction Spring 2020
road loop interchange, the new infrastructure will Package B Construction Spring 2020
include main lane improvements and direct Package C Construction
connection ramps to each facility. Package D Construction
Package E Construction Summer 2020
This project is split into five construction phases.
Package A is reconstructing the Six Flags Drive Bridge
over IH‐30 and will be bid as a joint project with the
IH‐30/SH‐360 Interchange Project (Package B).
Package C is the Great Southwest Industrial District
railroad bridge crossing just south of Randol Mill Road.
Package D includes the Randol Mill Road interchange
improvements and Package E includes improvements
from Abram Street to IH‐20.
Update:
Construction of Packages A, B, and E is proceeding
with no significant delays or milestones achieved
th
during the 4 quarter.