Page 320 - FY 2026-2027 Adopted Budget Book
P. 320

Rankin Drive Full Reconstruction &


               Improvements







               This project involves the full reconstruction of Rankin Drive from Forest Ridge Drive to Wade Drive.

               Rankin Drive has been included in the City's five-year Capital Improvement Plan and will be added again the
               current  five-year  Street  plan  due  to  low  pavement  condition  index  (PCI)  scores  and  the  condition  of  the
               roadway. The project will include full-depth pavement reconstruction, water line replacement (existing line is of
               unknown age and material and is past its serviceable life) and storm drain improvements to address known
               drainage concerns in the area. Drainage improvements are also consistent with recommendations in the City's
               Drainage Master Plan.

               Replacement of the aging water line and installation of storm drain infrastructure is expected to reduce long-
               term  maintenance  costs  associated  with  water  line  repairs  and  localized  flooding  response.  Reconstructed
               pavement will reduce routine maintenance needs for an estimated 20 year pavement life cycle. No significant
               increase to the operating budget is anticipated as a result of this project.























































    FY 2026-2027 Adopted Budget Book · September 15, 2026                                                            316
   315   316   317   318   319   320   321   322   323   324   325