Page 325 - CityofArlingtonFY26AdoptedBudget
P. 325

Enhance Regional Mobility

                          Goal 2: Plan, Manage, and Maintain Public Transportation Infrastructure
                           Objective 1: Optimize Effectiveness and Efficiency of Existing Transportation System
                          Project                  Performance Measure(s)                 Department(s)
             ERM   Airport Layout Plan with   Total Aircraft Operations        Transportation
             2.1.5  Narrative Update
             Summary:

             The current Airport Master plan was adopted by City Council in 2015. Since that adoption operations and interest in the
             Airport have significantly increased. Additional development on the Airports Western Perimeter is continuing to progress
             faster than the previous Master Plan was designed for. TxDOT Aviation is providing a grant for an update to the Airport
             Layout Plan as well as a narrative update focused heavily on operations forecasting and West side development.

             Update:
             The Airport Layout Plan has been approved by TxDOT Aviation and is currently awaiting approval from the FAA.



                      Airport Layout Plan with Narrative Update


                           Bid Release from TxDOT
                                  Aviation

                              Consultant Selection


                            Vendor replacement of
                                 equipment

                       Approval by City, TxDOT, FAA

                                                 6/24        8/24      10/24          12/24




































                                                             31
   320   321   322   323   324   325   326   327   328   329   330