Page 283 - CityofWataugaAdoptedBudgetFY25
P. 283

CIP AND CAPITAL PROJECTS FUNDS


            The programs the City of Watauga currently identifies include:

            Drainage Projects – Such projects include several drainage channels throughout the City that
            have been identified as known problem areas.  All developed property owners within the City
            pay a monthly drainage utility fee, which is utilized for drainage development, redevelopment,
            and  maintenance.    The  City  has  significantly  lessened  flooding  along  smaller  channels and
            ditches throughout the City by keeping these facilities free of foliage and debris.  These projects
            are included in the Operating Storm Drainage Fund and any long-term projects can be carried
            under General Capital or Water and Sewer Capital funds, depending on project goals.

            Signalization Projects - Such projects include the construction or redevelopment of traffic light
            signalization needs for the City.  These projects are included in the General Capital Fund.

            Special Building Projects – Such projects include the construction or major renovations of
            special facilities owned by the City.  These projects can be included in any of the three capital
            funds, depending on project purpose.

            Street Projects – Such projects include construction or major redevelopment of the 322 current
            streets in the City.  Street projects do not include normal repair and maintenance on sub-grades,
            milling, and overlay.  Both street projects and normal repair and maintenance activities of street
            are included in the General Capital Fund.

            Wastewater Projects – Such projects include improvements, expansions, or construction of
            wastewater lines in the City.    These projects are included in the Water and Sewer Capital Fund.

            Water Projects – Such projects include new waterlines or improvements to existing waterlines
            for future development or existing customer needs.  These projects are included in the Water
            and Sewer Capital Fund.

            Parks Projects – Parks projects improve the quality of life of Watauga residents and projects in
            the Parks Master Plan such as trails and parks improvements are included in the 5-year Capital
            Improvement Plan.

            Accounting for CIP Projects - The funds are accounted for on the modified accrual basis of
            accounting.  Revenues are recorded when available and measurable, and expenditures are
            recorded when the liability is incurred.  The Capital Projects Funds account for the acquisition
            of and construction or reconstruction of major capital facilities, infrastructure, and equipment.
            The  projects  are  financed  with  resources  allocated  to  the  General  Capital  Projects  Fund,
            Economic Development Corporation Capital Fund, and the Water and Sewer Capital Projects
            Fund.

            BRIEF HISTORY OF THE CITY’S CAPITAL IMPROVEMENTS PROGRAM (CIP)

            It has been the goal of the City of Watauga to have a Capital Improvements Program that is
            focused  on  adding  value  and  extending  the  life  of  City  infrastructure  with  no  increase  in
            operating costs or property tax.   Consideration is given to debt issuance only if the overall tax





                                                             263
   278   279   280   281   282   283   284   285   286   287   288