Page 468 - FY 2025 Adopted Operating Budget and Business Plan
P. 468
Return to Table of Contents
Financial/Economic Development
Goal 1: Continue Responsible Fiduciary Emphasis for the Organization and Council
Objective 2: Organize to Improve Operational Efficiency
Project Performance Measure(s) Department(s)
Core Internal Engineering Design 30,000 Linear Feet in FY 2024 Water Utilities
FED Services for Water Utilities
1.2.2
Summary:
Linear Feet Designed
The City of Arlington Water Utilities has historically
outsourced design phase services to private 35,000
professional engineering firms. It has been 30,000
determined that utilizing internal engineering staff for
design of specific projects would result in a lower 25,000
design cost per foot of water and/or sanitary sewer 20,000
lines. In FY 2014, Water Utilities began performing 15,000
design utilizing internal engineering staff. The 10,000
projects proposed for the internal design team consist
of small diameter water and sanitary renewal projects. 5,000
-
Update: FY 2024 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr
The in-house design team has provided sealed plans Total
th
for 9,508 linear feet in the 4 Quarter. The total
amount designed to date in FY 2024 is 30,042 linear
feet.
95