Page 405 - FY 2025 Adopted Operating Budget and Business Plan
P. 405

Return to Table of Contents




                                           Enhance Regional Mobility

                          Goal 2: Plan, Manage, and Maintain Public Transportation Infrastructure
                           Objective 1: Optimize Effectiveness and Efficiency of Existing Transportation System
                         Project                     Performance Measure(s)                 Department(s)
             ERM   I-30 and SH-360 Interchange  Overall satisfaction with the Management   Public Works
             2.1.2                            of Traffic Flow During Peak Hours
             Summary:
                                                                                        Estimated      Actual
                                                                     Milestone
             The purpose of this TxDOT project is to improve traffic                   Completion   Completion
             safety and reduce traffic congestion at the interchange of   Package A Construction   Spring 2023
             Interstate 30 and State Highway 360. Formerly a toll road   Package B Construction   Spring 2023   Dec. 2023
             loop interchange, the new infrastructure will include   Package C Construction   Pending
             main lane improvements and direct connection ramps to   Package D Construction   Pending
             each facility.                                    Package E Construction   Summer 2020   Apr. 2021

             This project is split into the following five construction
             phases:
                 •  Package A: Reconstruction of the Six Flags Drive
                    Bridge over I-30
                 •  Package B: I-30/SH-360 interchange
                    improvements
                 •  Package C: Great Southwest Industrial District
                    railroad bridge crossing just south of Randol Mill
                    Road
                 •  Package D: Randol Mill Road interchange
                    improvements
                 •  Package E: Improvements from Abram Street to
                    I-20

             Update:
             The contractor is currently working on Package A and
             finalizing punch list items.