Page 233 - BurlesonFY24AdoptedBudget
P. 233

   Hosted first equestrian camp (program reached maxed capacity for each
                                     offering)
                                    Hosted first Show Me How Festival: Festival educating community on the
                                     creation pf unique historical items and services.
                    Athletics: Replace pump controller for Chisenhall/Bailey Lake
                    Athletics: Install six new portable pitching mounds
                    Athletics: Restripe Chisenhall parking lot
                    Athletics: Added ball field clay to all fifteen fields.
                    Golf Course: Replaced pump station
                    Golf Course: Repaired and restored golf course bunkers
                    Golf Course: Repaired a large amount of drainage and cart path (est. completion May 23)
                    Golf Course: Record revenues in FY22 and continued growth into FY23
               Major Budget Items



                                  2022-2023                                      2023-2024
                BRiCk                                          BRiCk
                     Replacement of outdoor pool sand filter       Additional support staff
                     Replacement of meeting room partition         Kids Zone playground
                     LED Lighting - Indoor Track                   Replacement of women’s locker room
                     Replacement of men’s locker room locker         lockers
                        replacement                                 Additional facility cameras
                     HVAC Replacement                              Improved gym protective flooring
                     Outdoor pool shade structure addition         Shade structure for meeting room patio
                Parks                                               Replace indoor sand filters
                     Host 2 community tree planting events
                     Plant 78 new trees                       Parks
                     Installed 7 trash receptacles and 3 park      Host 2 community tree planting events
                        benches                                     Enhance Park security in 5 most
                     Resurfaced one sports court                     problematic parks by installing cameras
                     Repaired 100 linear sq ft of walking trail      with 4G
                     Resurfaced engineered wood fiber at 8         Renovate landscaping in front of BRiCk
                        playgrounds                                 Resurface one sports court
                Russell Farm                                        Enhance turf management program by
                     Chesapeake building partition addition          adding 75 acres of fertilization to
                                                                      emprove quality, health, and aesthetics
                     Several minor operational repairs and
                                                                      of turf in parks
                        facility additions (includes wheelchair     Replace all outdated, non-standard
                        accessible ramp to Chesapeake building,       furnishings at Warren Park as part of a 2
                        wood shop main door addition, Baker           year plan for updating all park furnishing
                        building foundation repair, and mobile  Russell Farm
                        home front porch lift)
                Athletics                                           Garage facility conversion to art /
                     Replace pump controller for                     classroom space
                        Chisenhall/Bailey Lake




                                                             233
                                                             233
   228   229   230   231   232   233   234   235   236   237   238