Page 357 - Cover 3.psd
P. 357

ADOPTED | BUDGET


                    Parks & Recreation Capital Projects


           Project Name                                        Project Description
         Adventure World        This project provides for the second phase of improvements at Adventure World Playground. A new
         Playground Improvements   small pavilion will be constructed adjacent to the playground. This project also includes a new irrigation
         Phase 2 - Continuing Project  system adjacent to the playground, parking areas and open space near Starnes Road.







         Annual Tree Planting   This project provides for the introduction of trees into the urban forest and replacement of trees that
         (2021) - Continuing Project  have died at various locations throughout the City. The project involves the installation of 3" caliper,
                                drought tolerant, native or adapted trees. Park facilities to receive trees includes Linda Spurlock Park,
                                Walker's Creek Park and Iron Horse Golf Course. The project includes mitigation replacement of 20
                                trees removed during installation of a major sanitary sewer line. At Iron Horse Golf Course, 30 trees will
                                be planted along the north side of Loop 820 to improve course aesthetics, also functioning to control
                                trash/debris inundating the course from the highway.



         Annual Tree Planting 2023 -   This project provides for the introduction of trees into the urban forest and replacement of trees that
         New Project            have died at various locations throughout the City. The project involves the installation of 3" caliper,
                                drought tolerant, native or adaptive trees. Areas to receive trees are located in the Blvd 26 median just
                                south of IH 820, the Glenview east median and the Bedford Euless Greenway.






         City Point Trail       This project will provide for the design and construction of a 10' wide multi-use trail in the Oncor
         Development in Oncor   easement just west of the City Point development from Glenview Drive northward to an existing 6' wide
         Easement - Continuing   residential pedestrian trail system adjacent to City Point Phase 2 along Blvd 26.
         Project







         Cross Timbers Bleacher   This project provides for the removal and replacement of shade canopies on 9 shade structures over
         Shade Replacement - New   selected bleachers at Cross Timbers Park..
         Project








         Cross Timbers Park     This project provides for the replacement of the playground at Cross Timbers Park. The Parks and
         Playground Replacement   Recreation Department developed an Infrastructure Management Plan for park amenities which
         with Shade - Continuing   address long term funding needs for replacement and renovation of park sites and their amenities.
         Project                Park assets are subject to continual heavy usage by citizens, exposure to the elements and natural
                                aging process. The Asset Management Plan and ongoing park inspections are used to identify assets
                                that have become worn, unsafe or unsightly and to create a priority timeline for their repair, renovation
                                or removal.










                                                             353                                     NRH  | TEXAS
   352   353   354   355   356   357   358   359   360   361   362