Page 358 - Cover 3.psd
P. 358
ADOPTED | BUDGET
Parks & Recreation Capital Projects
Project Name Project Description
Dr. Pillow Park Playground This project provides for the replacement of the playground at Dr. Pillow Park. The Parks and
Replacement with Shade - Recreation Department developed an Infrastructure Management Plan for park amenities which
New Project addresses long term funding needs for replacement and renovation of park sites and their amenities.
Park assets are subject to continual heavy usage by citizens, exposure to the elements and natural
aging process. The Asset Management Plan and ongoing park inspections are used to identify assets
that have become worn, unsafe or unsightly and to create a priority timeline for their repair, renovation
or removal.
Fossil Creek Park Mountain This project will provide for the development of mountain biking/hiking trails within Fossil Creek Park.
Bike Trails - Continuing The 58.5 acre park contains beautiful natural areas comprised of mature hardwood trees, a mixture of
Project grasslands and riparian habitats, all of which are ideally suited to hiking and mountain biking. Project
improvements include approximately 5 miles of trails serviced by a small parking lot and associated
park use signage.
Green Valley Park Safety This project provides for the addition of 1,200 LF of 6' tall black vinyl coated chain link fence between
Fence and Drainage all 8 soccer fields and their adjacent parking lots at Green Valley Park. Additionally, the project will
Improvements - New Project provide for the planning and implementation of swales in selected areas on fields 5-8 to improve
drainage for more efficient discharge of storm water after significant rainfall events.
Green Valley Raceway This project provides for the design and construction of an historical plaza adjacent to North Tarrant
Historical Area - Continuing Parkway, east of Smithfield Road where the John Barfield Trail meanders through what once was the
Project Green Valley Raceway. Proposed amenities include an attractive pedestrian and bicycle plaza with
benches, trash receptacles and signage with information and photographs that celebrate the rich
history of a bygone era in North Richland Hills.
Northfield Drive Sidewalk This project will provide for the construction of a 6' wide sidewalk along Northfield Drive from Davis
Connection From Davis Blvd eastward to the John Barfield Trail in Northfield Park. Additionally, the project will provide for some
Blvd to Northfield Park - much needed drainage corrections along the east end of Northfield Drive near the LIFEchurch
Continuing Project detention pond and the small dog side of Tipps Canine Hollow Dog Park.
NRH Centre Fitness This project provides replacement of the fitness equipment at the NRH Centre. In FY 22/23 the
Equipment Replacement - identified equipment to be replaced is listed below.
New Project
Signature Line/Selectorized Machines
Leg press, leg curl (prone), leg curl (seated), leg extension, ad/abduction combination (one piece
replacing two), bicep curl, tricep, ab crunch, torso/oblique, back extension, dip/chin, pulldown, chest
press, shoulder press
354 NRH | TEXAS