Utility Capital Projects
Project Name Project Description
Wastewater Manhole This project will replace or rehabilitate roughly 150 wastewater manholes throughout the City. The
Replacement and Department has identified three different rehabilitation techniques for this project. Each technique
Rehabilitation Project brings value to the project based on the need of the manhole that needs repair. The three techniques
(2022) - Continuing Project include: total reconstruction, cured-in-place fiberglass manhole liner, and sprayed epoxy manhole liner.
After completion of the rehabilitation process of a manhole, the system will experience less
inflow/infiltration due to rainwater and have less risk of a major wastewater issue resulting from a
manhole collapse.
Watauga Road 24" This project replaces the existing 12" water main from the Watauga Pump Station west of US 377 to
Transmission Main - New Rufe Snow Drive.
Project
Western Center Water In October 2005, the City had a Water and Wastewater Plan prepared that would cover future system
Facility Expansion - needs to "build out" (estimated at approximately 2017). One of the future needs identified was an
Continuing Project additional 5 million gallon ground storage tank to be located at the Western Center Storage and
Booster Pump Station site. The current site is not large enough to accommodate a new 5 million gallon
ground storage tank. This project will include purchasing an additional 2/3 of an acre adjacent to the
current site for the future expansion.