Page 291 - City of Watauga FY22 Adopted Budget
P. 291

CIP AND CAPITAL PROJECTS FUNDS




                   Justification:  The pole barn is in need of replacement due to its age and condition of
                   disrepair.   The barn will house parks equipment and provide protection for equipment
                   and vehicles such as sun damage and severe weather events.   The material bins will
                   provide storage for topsoil, mulch, and rock.   The bins will provide protection for loss of
                   materials from storm runoff.

                   Operating Impact:  This project will be funded through the 2018 Certificates of Obligation
                   and the 2020 Certificates of Obligation Proceeds.


                         FY2021-2022 ECONOMIC DEVELOPMENT PROJECTS DISCUSSION

            FY2021-2022 FOOD BUSINESS PARK PROJECT- $456,000

               ❖  Description:     The City applied for an EDA grant last year to assist with a restaurant
                   incubator  project.    Unfortunately,  this  was  not  granted,  resulting  in  a  rework  of  the
                   concept.  Instead, the EDC will construct a food business park at Capp Smith Park.  The
                   site is planned to include a small entertainment stage with associated parking.

                   Justification:  COVID-19 has severely impacted businesses in the area.  This project is
                   designed to spur economic develop activity in the city and surrounding region to  help
                   rebound from  the  impact.   In  addition,  the private ownership  of  available parcels has
                   caused the small restaurant entrepreneurs to seek other options outside of the City due
                   to cost of real estate.  The site will allow for mobile restaurants to support and promote
                   economic activity within the City of Watauga with the objective to give restaurant owners
                   the opportunity to build up a clientele in the Northeast Texas Mid-Cities area with minimal
                   start-up costs.

                   Operating  Impact:    Funds  will  be  provided  by  the  2020  Certificates  of  Obligation
                   proceeds.     The  City  anticipates  the  maintenance  of  the  food  business  park  to  be
                   approximately $3,000 per year after completion.


                                   FY2021-22 STREETS/SIDEWALKS DISCUSSION

            FY2021-2022 STREET OVERLAY

               ❖  Description:  This project provides for the curb and gutter,
                   subgrade,  milling  and  asphalt  overlay  for  7-8  streets
                   annually.

                   Justification:  The existing asphalt pavement for certain
                   streets is deteriorating.  The asphalt overlay will provide an
                   improved  riding  surface  and  will  extend  the  life  of  the
                   roadways and will enhance the appearance of the streets.