        Department                                             Project Title                         Project Number
        Public Works                      Sewer Manhole Replacement and Rehabilitation Project (2021)     UT2104
        Project Description
        This project will replace or rehabilitate roughly 150 wastewater manholes throughout the City. Staff has completed an inspection of
        approximately 5,500 manholes. Through this inspection process, it has been identified that 12% of the manholes (approximately
        660) need some form of replacement or rehabilitation. This project will be spread out over a 5 year period to complete all 660
        manholes.






        Project Justification
        Through the inspection process of the wastewater manholes, staff assessed each manhole on overall structural condition,
        maintenance responsibility, and inflow/infiltration present. Each manhole was given a numerical grade on structural and
        maintenance condition, with inflow/infiltration being noted as observed or being present. All manholes were inspected by one staff
        member so grading would be consistent among all manholes. The manholes that makeup the 660 that need attention were graded
        poor and very poor. The majority of these manholes also were noted to have inflow/infiltration. Inflow/infiltration in the wastewater
        system causes many difficulties for the system. With rain events, the inflow/infiltration allows rainwater into the system causing
        capacity issues with the possibility of creating sanitary sewer overflows. The additional rainwater also creates additional wastewater
        flow to the treatment plants, which the City pays for in wastewater charges from the treatment plants. Brick manholes are a major
        factor with allowing inflow/infiltration into the wastewater system. Brick manholes are no longer a method of building manholes. The
        Department has identified three different rehabilitation techniques for this project. Each technique brings value to the project based
        on the need of the manhole that needs repair. The three techniques include: total reconstruction, cured-in-place fiberglass manhole
        liner, and sprayed epoxy manhole liner. After completion of the rehabilitation process of a manhole, the system will experience less
        inflow/infiltration due to rainwater and have less risk of a major wastewater issue resulting from a manhole collapse.

        Note: Project funding source is the Utility Fund (405).
        Project Schedule        Beginning Date  Ending Date  History       Fiscal Year   Amount
        Professional Services                             Proposed          2020-21       $250,000
        Engineering/Design                                Total                           $250,000
        Land/ROW Acquisition
        Construction               10/2020      09/2021
        Other
        Total Schedule             10/2020      09/2021
        Sources of Funds          To Date    2020-21 Budget 2021-22 Estimate  2022-Completion  Total Funding
        General Obligation Bonds
        Certificates of Obligation
        Federal/State Grants
        Reserves                          0        250,000            0             0      $250,000
        Sales Tax
        Other
        Total Funding                    $0        $250,000          $0            $0      $250,000
        Project Costs             To Date    2020-21 Budget 2021-22 Estimate  2022-Completion  Total Cost
        Professional Services
        Engineering/Design
        Land/ROW Acquisition
        Construction                      0        250,000            0             0      $250,000
        Other
        Total Costs                       $0       $250,000          $0            $0      $250,000
        Operating Impact
        No operating impact is anticipated.


        Fiscal Year                2020-21       2021-22      2022-23       2023-24       2024-25     Total Impact
        Amount                           $0            $0            $0            $0            $0            $0
        Total Operating Impact           $0            $0            $0            $0            $0            $0