Page 280 - Manfield FY21 Budget
P. 280

$1,951,500 – 16/24” Water Line Walnut              $1,000,000 – Hogpen Branch Channel
               Creek                                              Stabilization
               This project consists of a 24-inch water line from    This project will  stabilize the channel and prevent
               Newt Patterson Road to the Union Pacific Railroad   further erosion around the raw  water  pipelines  that
               and from Main Street to the Union Pacific Railroad.   supply water to the BEWTP.
               This project also consists of a 16-inch water line from
               the Union Pacific Railroad to Broad Street. The
               proposed water line will provide additional
               transmission capacity and relieve low available fire
               flows in the Upper Pressure Plane.




















































                                                                                                         279
   275   276   277   278   279   280   281   282   283   284   285