$3,841,500 – 12/15” Wastewater Line in             $3,754,000 – Sewer Crossings Construction
               Walnut Creek Upper Basin                           This project consists of repair, replacement, or
               This project consists of a 12/15-inch sewer line in the   stabilization  for five  separately located  wastewater
               southwest corner of Walnut Creek Upper Basin from   mains that  have been undermined by creek or
               south of Broad Street to the existing 24-inch sewer   drainage erosion.  All locations pose a high
               line at Wilson Drive. This project also consists of a   environmental risk should they  continue  to
               12/15-inch sewer line from west of 6th Avenue to the   deteriorate.
               existing 30-inch sewer line along Walnut Creek,
               replacing the existing 8/12-inch sewer line. The
               proposed improvements will provide capacity for
               projected development in the Walnut  Creek Upper
               Basin.















                                                                  $1,265,000 – Network and SCADA
                                                                  Cybersecurity
                                                                  This project replaces unsupported  Supervisory
                                                                  Controls and Data Acquisition (SCADA) equipment
                                                                  located  at  the  Bud  Ervin  Water  Treatment  Plant
                                                                  (BEWTP).  This project also improves the  network
                                                                  security and functionality at the BEWTP.
               $982,800 – 12” Water Line North Main
               This project consists of a 12-inch  water line along
               Mansfield Highway from Turner Warnell to Nelson
               Wyatt Road. The  proposed  water line  will provide
               additional transmission capacity and relieve low
               available fire flows in the Upper Pressure Plane.