Page 279 - Manfield FY21 Budget
P. 279
$3,841,500 – 12/15” Wastewater Line in $3,754,000 – Sewer Crossings Construction
Walnut Creek Upper Basin This project consists of repair, replacement, or
This project consists of a 12/15-inch sewer line in the stabilization for five separately located wastewater
southwest corner of Walnut Creek Upper Basin from mains that have been undermined by creek or
south of Broad Street to the existing 24-inch sewer drainage erosion. All locations pose a high
line at Wilson Drive. This project also consists of a environmental risk should they continue to
12/15-inch sewer line from west of 6th Avenue to the deteriorate.
existing 30-inch sewer line along Walnut Creek,
replacing the existing 8/12-inch sewer line. The
proposed improvements will provide capacity for
projected development in the Walnut Creek Upper
Basin.
$1,265,000 – Network and SCADA
Cybersecurity
This project replaces unsupported Supervisory
Controls and Data Acquisition (SCADA) equipment
located at the Bud Ervin Water Treatment Plant
(BEWTP). This project also improves the network
security and functionality at the BEWTP.
$982,800 – 12” Water Line North Main
This project consists of a 12-inch water line along
Mansfield Highway from Turner Warnell to Nelson
Wyatt Road. The proposed water line will provide
additional transmission capacity and relieve low
available fire flows in the Upper Pressure Plane.
278