CITY OF HALTOM CITY aNNUAL BUDGET, FY2021                    GENERAL FUND




          STREET AND DRAINAGE



                      Mission Statement



          To perform maintenance of streets, drainage and traffic control systems in a manner that will pro-
          vide for the safe and efficient movement of traffic and to ensure flow of storm water through the
          enclosed drainage collection system.

          The Street Maintenance Department general duties and responsibilities include: maintain and
          repair streets, sweep streets and curbs, maintain and install traffic control devices (signs, signals
          and pavement markings), maintain and mow city owned properties.




               Accomplishments of FY2020

              ◊  Removed and Replaced 900 linear feet of curb and gutter with 11 Drive Approaches. Then
                 overlayed the street with 286 tons of Type D surface mix
              ◊  Removed  and  Replaced  581  linear  feet  of  curb  and  gutter  with  10  Drive  Approaches.
                 Removed existing asphalt and subgrade then replaced with 95 tons of recycled concrete for
                 subgrade, and 245 tons of Type D surface mix.
              ◊  Removed existing asphalt, and widened the road then replaced subgrade with 40 tons of
                 recycled concrete for subgrade and 77 tons of Type D surface mix on Rogers St.
              ◊  Removed existing asphalt, and widened the road then replaced subgrade with 50 tons of
                 recycled concrete for subgrade and 75 tons of Type D surface mix on Edwards St.
              ◊  Removed asphalt and concrete in the 5700 Block of Lower Birdville so that Reliable Paving
                 could replace 1500 linear foot of curb and gutter, 6 drive approaches, 600 tons of Type B
                 asphalt(Binder), and 305 tons of Type D surface mix.
              ◊  Replaced  Traffic  Signal  and  installed  a  battery  back-up  system  at  Western  Center  and
                 Haltom Rd.
              ◊  Replaced 107 regulatory Signs
              ◊  Made repairs to 277 traffic signals
              ◊  Swept 2,794 curb miles of streets




                   Objectives of FY2021


                Install Battery Back-up Systems on Traffic Signal Lights
                Decrease the amount of time for water/sewer street cut repairs
                Replace subgrade curb, gutter, 3 drive approaches and asphalt in the 5000 block of Melissa.
                Replace and upgrade traffic signal boxes at Haltom High School and Fire Station 1
                Crack Seal 5 lane miles of city streets