Page 172 - Colleyville FY21 Budget
P. 172

bacteria.  Samples  are  also  tested  for  lead  and  copper.  The  Engineering  Division
                       oversees the construction of water infrastructure delivery system components to make
                       certain that improvements meet Colleyville Development Standards. These standard
                       practices ensure the delivery of clean, pure water to citizens.

                   2.  Ensure  wastewater  is  managed  in  a  safe  and  efficient  manner  for  the  sake  of
                       maintaining the public health.

                       3.2 - Ensure regular replacement of water and wastewater facilities

                       Wastewater  collection  provides  environmentally-friendly  conveyance  of  our
                       wastewater to the treatment plant operated by the Trinity River Authority.  Maintaining
                       and  operating  existing infrastructure  to  reduce  the  effect  of our  waste  material  on
                       health and the environment is crucial. The Wastewater division takes an aggressive
                       approach  to  this  responsibility  through  a  proactive  monitoring  and  preventive
                       maintenance program. These operations include cleaning and inspecting 180 miles of
                       sewer mains in addition to 2,686 manholes and
                       three  (3)  lift  stations.  The  construction  of  new
                       public  infrastructure  is  inspected  by  the
                       Engineering Division to ensure that it meets all
                       necessary  specifications.  This  comprehensive
                       program serves the public by maintaining a safe
                       and healthy environment.














































                                                             170
   167   168   169   170   171   172   173   174   175   176   177