Page 383 - Southlake FY20 Budget
P. 383

CIP

      UTILITY FUnD



           SPIN   Neigh-  bor-  hood  5,6   3              5            3            1          7

            Comprehen-  sive Plan   Reference  Water   System   Master Plan   #19 -WWS9-  Tier 2  Waste Water   System   Master  Plan   #4 -WWS17-  Tier 2  Water   System   Master Plan   #15-WWS9-   Tier 2  Water   System   Master Plan   #15 -WWS9-   Tier 2  Sustainability   Master Plan  Sustainability   Master Plan



           Project's   Impact to   Annual   Operating   Budget  $10,000  $5,000  $10,000  $15,000  $0  $0


          Descrip-  tion of   Annual   Impact on   Operating   Budget  Increase in   preven-  tive and   corrective   mainte-  nance.  Increase in   preven-  tive and   corrective   mainte-  nance.  Increase in   preven-  tive and   corrective   mainte-  nance.  Increase in   preven-  tive and   corrective   mainte-  nance.  No ad-  ditional   cost after   repaint-  ing.  No ad-  ditional   cost after   repaint-  ing.



            FY 2020   Cumula-  tive  $2,150,000  $2,150,000  $2,150,000  $2,150,000  $2,150,000  $2,150,000



              Total       $560,000          $700,000       $1,600,000   $1,600,000   $900,000   $900,000


             Beyond /   Unfunded  $0        $0             $0           $600,000     $800,000   $900,000




              FY 2024     $0                $0             $0           $0           $0         $0


              FY 2023     $0                $0             $0           $0           $100,000   $0



              FY 2022     $500,000          $450,000       $1,300,000   $850,000     $0         $0



              FY 2021     $60,000           $250,000       $300,000     $150,000     $0         $0


              FY 2020     $0                $0             $0           $0           $0         $0


             Total Prior   Funding  $0      $0             $0           $0           $0         $0




                    Funding is requested for   right of way, engineering   a 12-inch water line along   Court to Southridge Lakes   in this region and to com-  pensate for development   and growth.  Funding is requested for   right of way, engineering   development west along   sewer line will provide   service to planned mixed-  114 in Basin N-18.  Funding is requested for   right of way, engineering   upsize an existing 8-inch   Randol Mill Avenue from   Funding is requested for
              Description  design and construction of   N. Peytonville from Concho   Parkway to increase capacity   design and construction of  an 8-inch sanitary sewer line  to extend service for future   Keystone Drive then south  along White Chapel Boule- vard.  The proposed 8-inch   use developments along SH   design and construction to   water line to 12-inch along   Morgan Road to Dove Road.  the engineering design and   existing 6-inch water line to   Street from Blythe Lane t





              Project Name  12-inch   Water line   along North   Peytonville   from Concho   Court to   Southridge   Lakes Park-  way  8-inch Sewer   line in Basin   N-18 along   White Chapel   Boulevard  12-inch   Water line   along Randol   Mill Avenue   from Morgan   Road to Dove   Road  Upsize exist-  ing 6-inch to   12-inch Wa-  ter line along   East Highland   from Blythe   Lane to N.   Kimball   Avenue  Repainting   of the Dove   Elevated Stor-  age Tank  Repainting of   the B




              Fund       Utility   Fund    Utility   Fund  Utility   Fund  Utility   Fund  Utility   Fund  Utility   Fund


              Project #   UF14              UF15           UF16         UF17         UF18       UF19




    382                                        www.CityofSouthlake.com
   378   379   380   381   382   383   384   385   386   387   388